Consol Pennsylvania Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Grounding metallic frames, casings, and other enclosures of electric equipment.
Bailey Mine · 360723030 CFR 75.701 · $193.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Travelways at surface installations.
Bailey Mine · 360723030 CFR 77.205(b) · $151.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
HARVEY MINE · 361004530 CFR 75.601-1 · $151.00 proposed penalty
Machinery
ENLOW FORK MINE · 3607416Days away from work only
Accident narrative
The accident happened because roof plate and pie pans were picked up by the magnet and employee was working under the magnet and someone was checking the power and turned off the power to the magnet the items on the magnet let loose and fell on top of the employee. A roof plate struck employee in the back of head.
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 75.1722(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Accumulation of combustible materials.
Bailey Mine · 360723030 CFR 75.400 · $151.00 proposed penalty
Violation — cited standard not reported
Bailey Mine · 3607230$215.00 proposed penalty
Violation — cited standard not reported
Bailey Mine · 3607230$215.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bailey Mine · 360723030 CFR 75.512 · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Bailey Mine · 360723030 CFR 75.1731(a) · $151.00 proposed penalty
Temporary, portable containers.
Bailey Mine · 360723030 CFR 47.44(b) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Bailey Mine · 360723030 CFR 77.502 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Bailey Mine · 360723030 CFR 77.502 · $151.00 proposed penalty
Mechanical equipment guards.
Bailey Mine · 360723030 CFR 77.400(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HARVEY MINE · 361004530 CFR 75.1731(b) · $151.00 proposed penalty
Spot Inspections
Bailey Mine · 3607230103(i) · 6.0 on-site hours reported
Other safeguards.
Bailey Mine · 360723030 CFR 75.1403 · $151.00 proposed penalty
Ventilation controls.
Bailey Mine · 360723030 CFR 75.333(c)(3) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Bailey Mine · 360723030 CFR 75.370(a)(1) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bailey Mine · 360723030 CFR 75.1725(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Maintenance of incombustible content of rock dust.
ENLOW FORK MINE · 360741630 CFR 75.403 · $209.00 proposed penalty
Quarterly sampling; designated areas.
ENLOW FORK MINE · 360741630 CFR 70.209(a) · $151.00 proposed penalty
Preshift examination at fixed intervals.
Bailey Mine · 360723030 CFR 75.360(b)(8) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.