CONSOL Mining Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Impoundment Spot Inspection
Meigs #31 Mine · 33011729.0 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Robena Preparation Plant · 360417530 CFR 77.502 · $288.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
Robena Preparation Plant · 360417530 CFR 77.516 · $151.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
Robena Preparation Plant · 360417530 CFR 77.516 · $288.00 proposed penalty
General instructions for completing MSHA Form 7000-1.
Meigs #31 Mine · 330117230 CFR 50.20-1 · $151.00 proposed penalty
Regular Safety and Health Inspection
Meigs #31 Mine · 330117256.0 on-site hours reported
Impoundment Spot Inspection
Meigs #31 Mine · 33011728.5 on-site hours reported
Regular Safety and Health Inspection
Robena Preparation Plant · 360417551.5 on-site hours reported
Other Technical Compliance Investigations
Meigs #31 Mine · 330117210.5 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Meigs #31 Mine · 330117230 CFR 77.502 · $151.00 proposed penalty
Regular Safety and Health Inspection
Meigs #31 Mine · 330117253.3 on-site hours reported
Regular Safety and Health Inspection
Robena Preparation Plant · 360417545.0 on-site hours reported
Impoundment Spot Inspection
Meigs #31 Mine · 330117210.0 on-site hours reported
Impoundment Spot Inspection
Meigs #31 Mine · 330117210.0 on-site hours reported
Machinery
Robena Preparation Plant · 3604175Dys awy frm wrk & restrctd act
Accident narrative
Employee was tightening a centerline cable for a dredge boat. Weather was clear temperature around 70 degrees Fahrenheit. As the employee was gaining tension on the centerline cable, the sideline cable the centerline was attached to was released due to a clamp failure. This caused the centerline cable and associated puller to strike the affected employee in the left leg.
First aid equipment; location; minimum requirements.
Meigs #31 Mine · 330117230 CFR 77.1707(b)(8) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Meigs #31 Mine · 330117230 CFR 77.1605(k) · $883.00 proposed penalty
Regular Safety and Health Inspection
Meigs #31 Mine · 330117244.5 on-site hours reported
Impoundment Spot Inspection
Meigs #31 Mine · 330117210.0 on-site hours reported
Regular Safety and Health Inspection
Robena Preparation Plant · 360417525.0 on-site hours reported
Impoundment Spot Inspection
Meigs #31 Mine · 330117211.5 on-site hours reported
Impoundment Spot Inspection
Meigs #31 Mine · 330117210.0 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Robena Preparation Plant · 360417530 CFR 77.502 · $151.00 proposed penalty
Regular Safety and Health Inspection
Robena Preparation Plant · 360417522.0 on-site hours reported
Slip or fall of person
Meigs #31 Mine · 3301172Days away from work only
Accident narrative
Employee walking down an incline to the boot washroom slipped on ice fell on left wrist. There were steps and a walkway that could use, the employee took a short cut. This wasn't reported till the next day at 9:30am
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.