Coal-Mac MET, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspection
Eagle Energy Mine No.1 · 46094257.5 on-site hours reported
Protection from falls of roof, face and ribs.
Eagle Energy Mine No.1 · 460942530 CFR 75.202(a) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1606(c) · $818.00 proposed penalty
Loading and haulage equipment; installations.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1605(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1606(c) · $366.00 proposed penalty
Mobile equipment; automatic warning devices.
DEEPWATER SURFACE MINE · 460910530 CFR 77.410(a)(1) · $267.00 proposed penalty
Mobile equipment; automatic warning devices.
DEEPWATER SURFACE MINE · 460910530 CFR 77.410(a)(1) · $267.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1606(c) · $366.00 proposed penalty
Flammable liquids; storage.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1103(d) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Eagle Energy Mine No.1 · 460942530 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty
Ventilation controls.
Eagle Energy Mine No.1 · 460942530 CFR 75.333(d)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Eagle Energy Mine No.1 · 460942530 CFR 75.370(a)(1) · $151.00 proposed penalty
Identification of circuit breakers.
Eagle Energy Mine No.1 · 460942530 CFR 75.904 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1606(c) · $336.00 proposed penalty
Regular Safety and Health Inspection
Eagle Energy Mine No.1 · 460942554.3 on-site hours reported
Verbal Hazard Complaint Inspections
Deep Water Prep Plant P-2 · 46091626.0 on-site hours reported
Sanitary toilet facilities; maintenance.
Deep Water Prep Plant P-2 · 460916230 CFR 71.501 · $313.00 proposed penalty
Drilling; general.
DEEPWATER SURFACE MINE · 460910530 CFR 77.1007(b) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Eagle Energy Mine No.1 · 46094250.8 on-site hours reported
Loading and haulage equipment; installations.
Deep Water Prep Plant P-2 · 460916230 CFR 77.1605(e) · $313.00 proposed penalty
Examination and maintenance of firefighting equipment.
Deep Water Prep Plant P-2 · 460916230 CFR 77.1110 · $151.00 proposed penalty
Travelways at surface installations.
Deep Water Prep Plant P-2 · 460916230 CFR 77.205(c) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Deep Water Prep Plant P-2 · 460916230 CFR 77.502 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Glenco Load-Out · 460921830 CFR 77.502 · Significant and substantial (S&S) · $697.00 proposed penalty
Regular Safety and Health Inspection
DEEPWATER SURFACE MINE · 4609105197.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.