Coal Mac, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Inspection and cover plates.
Delbarton Preparation Plant · 460564930 CFR 77.512 · $366.00 proposed penalty
Requirement for container labels.
Delbarton Preparation Plant · 460564930 CFR 47.41(a) · $245.00 proposed penalty
Travelways at surface installations.
Delbarton Preparation Plant · 460564930 CFR 77.205(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Surface installations; general.
Delbarton Preparation Plant · 460564930 CFR 77.200 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Highwalls, pits and spoil banks; plans.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1000 · $1,037.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.502 · $151.00 proposed penalty
Requirement for container labels.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 47.41(a) · $151.00 proposed penalty
Sanitary toilet facilities; maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 71.501 · $313.00 proposed penalty
Machinery and equipment; operation and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.404(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.
RAGLAND LOADOUT · 460856330 CFR 48.3(c)(3) · $151.00 proposed penalty
Warning signs; smoking and open flame.
RAGLAND LOADOUT · 460856330 CFR 77.1102 · $151.00 proposed penalty
Loading and haulage equipment; installations.
RAGLAND LOADOUT · 460856330 CFR 77.1605(a) · Significant and substantial (S&S) · $165.00 proposed penalty
Highwalls, pits and spoil banks; plans.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1000 · $5,144.00 proposed penalty
Mechanical equipment guards.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.400(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Machinery and equipment; operation and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.404(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Examination and maintenance of firefighting equipment.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1110 · $209.00 proposed penalty
Machinery and equipment; operation and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.404(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Delbarton Preparation Plant · 460564930 CFR 77.1606(c) · $366.00 proposed penalty
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104 · $883.00 proposed penalty
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Vehicles used to transport explosives.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1302(j) · $465.00 proposed penalty
Hoisting of materials.
Holden #22 Surface · 460898430 CFR 77.210(a) · $1,818.00 proposed penalty
Machinery and equipment; operation and maintenance.
Holden #22 Surface · 460898430 CFR 77.404(a) · $3,184.00 proposed penalty
Regular Safety and Health Inspection
TWIN BRANCH NO 1 SURFACE · 4609075307.3 on-site hours reported
Surface installations; general.
Delbarton Preparation Plant · 460564930 CFR 77.200 · $818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.