Coal Mac East safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Drill dust control at surface mines and surface areas of underground mines.
Middle Fork Surface · 460964530 CFR 72.620 · $959.00 proposed penalty
Drilling; general.
Middle Fork Surface · 460964530 CFR 77.1007(b) · $151.00 proposed penalty
Drill dust control at surface mines and surface areas of underground mines.
Middle Fork Surface · 460964530 CFR 72.620 · $959.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lower War Eagle · 460931930 CFR 75.512 · $177.00 proposed penalty
Condition and examination of firefighting equipment.
Lower War Eagle · 460931930 CFR 75.1100-3 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Middle Fork Surface · 460964530 CFR 77.1606(c) · $165.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Middle Fork Surface · 460964530 CFR 77.1606(c) · $165.00 proposed penalty
Spot Inspections
Lower War Eagle · 4609319103(i) · 8.5 on-site hours reported
Short circuit protection; ratings and settings of circuit breakers.
Lower War Eagle · 460931930 CFR 75.601-1 · $245.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Lower War Eagle · 460931930 CFR 75.1106-3(a)(2) · $245.00 proposed penalty
Testing, examination, and maintenance of circuit breakers; procedures.
Powellton #1 Mine · 460921730 CFR 75.900-3 · $465.00 proposed penalty
Violation — cited standard not reported
Powellton #1 Mine · 4609217Significant and substantial (S&S) · $2,569.00 proposed penalty
Electrical connections or splices; suitability.
Lower War Eagle · 460931930 CFR 75.514 · $366.00 proposed penalty
Ladders; construction; installation and maintenance.
Middle Fork Surface · 460964530 CFR 77.206(c) · $151.00 proposed penalty
Mechanical equipment guards.
Powellton #1 Mine · 460921730 CFR 77.400(b) · $151.00 proposed penalty
Automatic fire warning devices; actions and response.
Powellton #1 Mine · 460921730 CFR 75.1103-5(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Powellton #1 Mine · 460921730 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Powellton #1 Mine · 460921730 CFR 75.1731(a) · $151.00 proposed penalty
Cable fittings; suitability.
Lower War Eagle · 460931930 CFR 75.515 · $245.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $209.00 proposed penalty
Other safeguards.
Lower War Eagle · 460931930 CFR 75.1403 · $366.00 proposed penalty
Roof control plan.
Lower War Eagle · 460931930 CFR 75.220(a)(1) · $165.00 proposed penalty
Inspection of fire suppression devices.
Lower War Eagle · 460931930 CFR 75.1107-16(b) · $151.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $465.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.