Berms or guardrails.
HENDERSON OPERATIONS · 050079030 CFR 57.9300(d)(1) · $1,550.00 proposed penalty
Controls and switches.
HENDERSON OPERATIONS · 050079030 CFR 57.12002 · $465.00 proposed penalty
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(a) · $245.00 proposed penalty
Electrical conductors.
HENDERSON OPERATIONS · 050079030 CFR 57.12004 · $193.00 proposed penalty
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(b) · $209.00 proposed penalty
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(b) · $151.00 proposed penalty
Warning signs.
HENDERSON OPERATIONS · 050079030 CFR 57.4101 · $151.00 proposed penalty
Testing grounding systems.
HENDERSON OPERATIONS · 050079030 CFR 57.12028 · $2,503.00 proposed penalty
Temporary, portable containers.
HENDERSON OPERATIONS · 050079030 CFR 47.44(b) · $151.00 proposed penalty
Combustible waste.
HENDERSON OPERATIONS · 050079030 CFR 57.4104(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Testing grounding systems.
HENDERSON OPERATIONS · 050079030 CFR 57.12028 · $755.00 proposed penalty
Securing gas cylinders.
HENDERSON OPERATIONS · 050079030 CFR 57.16005 · $151.00 proposed penalty
Identification of power switches.
HENDERSON OPERATIONS · 050079030 CFR 57.12018 · $465.00 proposed penalty
Access to stationary electrical equipment or switchgear.
HENDERSON OPERATIONS · 050079030 CFR 57.12019 · $151.00 proposed penalty
Restricted clearance.
HENDERSON OPERATIONS · 050079030 CFR 57.11008 · Significant and substantial (S&S) · $697.00 proposed penalty
Non-Injury Accident Investigation
HENDERSON OPERATIONS · 05007906.0 on-site hours reported
Inspection and cover plates.
HENDERSON OPERATIONS · 050079030 CFR 57.12032 · $151.00 proposed penalty
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(b) · $209.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
HENDERSON OPERATIONS · 050079030 CFR 50.20(a) · $151.00 proposed penalty
Inspection and cover plates.
HENDERSON OPERATIONS · 050079030 CFR 57.12032 · $151.00 proposed penalty
Construction and maintenance of guards.
HENDERSON OPERATIONS · 050079030 CFR 57.14112(a)(2) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(a) · $245.00 proposed penalty
Regular Safety and Health Inspection
HENDERSON OPERATIONS · 0500790183.8 on-site hours reported
Stationary grinding machines.
HENDERSON OPERATIONS · 050079030 CFR 57.14115(b) · $209.00 proposed penalty
Impoundment Spot Inspection
HENDERSON OPERATIONS · 05007903.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.