CIMBAR Performance Minerals safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
First aid.
Houston Plant #2 · 410554030 CFR 56.18010 · $226.00 proposed penalty
Horns and backup alarms.
Houston Plant #2 · 410554030 CFR 56.14132(a) · $226.00 proposed penalty
General requirements.
Houston Plant #2 · 410554030 CFR 56.4200(b)(1) · $226.00 proposed penalty
Brakes.
Houston Plant #2 · 410554030 CFR 56.14101(a)(2) · $226.00 proposed penalty
Regular Safety and Health Inspection
Houston Plant #2 · 410554021.8 on-site hours reported
Identification of power switches.
CIMBAR-MV · 120250730 CFR 56.12018 · $366.00 proposed penalty
Insulation and fittings for power wires and cables.
CIMBAR-MV · 120250730 CFR 56.12008 · $165.00 proposed penalty
Inspection and cover plates.
CIMBAR-MV · 120250730 CFR 56.12032 · $165.00 proposed penalty
Electrical conductors.
CIMBAR-MV · 120250730 CFR 56.12004 · $697.00 proposed penalty
Securing gas cylinders.
CIMBAR-MV · 120250730 CFR 56.16005 · $366.00 proposed penalty
Electrical conductors.
CIMBAR-MV · 120250730 CFR 56.12004 · $1,679.00 proposed penalty
Housekeeping.
CIMBAR-MV · 120250730 CFR 56.20003(a) · $366.00 proposed penalty
Correction of dangerous conditions.
CIMBAR-MV · 120250730 CFR 56.12030 · $642.00 proposed penalty
Regular Safety and Health Inspection
CIMBAR-MV · 120250728.5 on-site hours reported
Correction of dangerous conditions.
CIMBAR-MV · 120250730 CFR 56.12030 · $1,431.00 proposed penalty
Electrical conductors.
CIMBAR-MV · 120250730 CFR 56.12004 · $755.00 proposed penalty
Testing grounding systems.
Houston Plant #2 · 410554030 CFR 56.12028 · $366.00 proposed penalty
Regular Safety and Health Inspection
Houston Plant #2 · 410554019.8 on-site hours reported
Identification of power switches.
Houston Plant #2 · 410554030 CFR 56.12018 · $366.00 proposed penalty
Requirement for container labels.
Houston Plant #2 · 410554030 CFR 47.41(a) · $366.00 proposed penalty
Electrical conductors.
CIMBAR-MV · 120250730 CFR 56.12004 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Electrical conductors.
CIMBAR-MV · 120250730 CFR 56.12004 · $1,550.00 proposed penalty
Construction and maintenance of guards.
CIMBAR-MV · 120250730 CFR 56.14112(a) · $165.00 proposed penalty
Correction of dangerous conditions.
CIMBAR-MV · 120250730 CFR 56.12030 · $642.00 proposed penalty
Electrical conductors.
CIMBAR-MV · 120250730 CFR 56.12004 · $1,818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.