← Chase Crushing LLC

Chase Crushing LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F0170A2
    CHASE-2WH · 0203089

    5.5 on-site hours reported

  2. Insulation and fittings for power wires and cables.

    violationRecord 5103255
    CHASE-2WH · 0203089

    30 CFR 56.12008 · $151.00 proposed penalty

  3. Compliance Follow-up Inspection

    inspectionRecord F014109
    CHASE-2WH · 0203089

    0.8 on-site hours reported

  4. Regular Safety and Health Inspection

    inspectionRecord F014104
    CHASE-2WH · 0203089

    6.0 on-site hours reported

  5. Operators stations.

    violationRecord 9686913
    CHASE-2WH · 0203089

    30 CFR 56.14103(b) · $151.00 proposed penalty

  6. Changes; notification by operator.

    violationRecord 9686912
    CHASE-2WH · 0203089

    30 CFR 41.12 · $151.00 proposed penalty

  7. New task training.

    violationRecord 9686911
    CHASE-2WH · 0203089

    30 CFR 46.7(a) · Significant and substantial (S&S) · $480.00 proposed penalty

  8. Construction and maintenance of guards.

    violationRecord 9686910
    CHASE-2WH · 0203089

    30 CFR 56.14112(b) · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F0140FF
    CHASE-1SL · 2602406

    2.8 on-site hours reported

  10. Regular Safety and Health Inspection

    inspectionRecord F0140F2
    CHASE-3CP · 0202857

    5.3 on-site hours reported

  11. Brakes.

    violationRecord 9686860
    CHASE-3CP · 0202857

    30 CFR 56.14101(a)(2) · $642.00 proposed penalty

  12. Housekeeping.

    violationRecord 9686859
    CHASE-3CP · 0202857

    30 CFR 56.20003(a) · $193.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 9686858
    CHASE-3CP · 0202857

    30 CFR 56.14112(b) · $288.00 proposed penalty

  14. Construction and maintenance of guards.

    violationRecord 9686857
    CHASE-3CP · 0202857

    30 CFR 56.14112(b) · $288.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord F0140E9
    CHASE-1SL · 2602406

    4.5 on-site hours reported

  16. New task training.

    violationRecord 9686846
    CHASE-1SL · 2602406

    30 CFR 46.7(a) · $168.00 proposed penalty

  17. Independent contractor register.

    violationRecord 9686845
    CHASE-1SL · 2602406

    30 CFR 45.4(b) · $151.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord F011F06
    CHASE-2WH · 0203089

    14.0 on-site hours reported

  19. Moving machine parts.

    violationRecord 9686653
    CHASE-2WH · 0203089

    30 CFR 56.14107(a) · $151.00 proposed penalty

  20. Construction and maintenance of guards.

    violationRecord 9686652
    CHASE-2WH · 0203089

    30 CFR 56.14112(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.