Central Plains Cement Co. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Correction of hazardous conditions.
Tulsa Plant · 340002630 CFR 56.3200 · $313.00 proposed penalty
Protection for openings around travelways.
Tulsa Plant · 340002630 CFR 56.11012 · $313.00 proposed penalty
Construction and maintenance of guards.
Tulsa Plant · 340002630 CFR 56.14112(b) · $465.00 proposed penalty
Electrical conductors.
Tulsa Plant · 340002630 CFR 56.12004 · $1,320.00 proposed penalty
Moving machine parts.
Tulsa Plant · 340002630 CFR 56.14107(a) · $151.00 proposed penalty
Conveyor start-up warnings.
Tulsa Plant · 340002630 CFR 56.14201(b) · $398.00 proposed penalty
Danger signs.
Tulsa Plant · 340002630 CFR 56.12021 · $1,320.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Tulsa Plant · 340002630 CFR 50.30(a) · $151.00 proposed penalty
Housekeeping.
Tulsa Plant · 340002630 CFR 56.20003(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Safety defects; examination, correction and records.
Tulsa Plant · 340002630 CFR 56.14100(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Inspection.
Tulsa Plant · 340002630 CFR 56.4201(a)(2) · $398.00 proposed penalty
Spillage and leakage.
Tulsa Plant · 340002630 CFR 56.4102 · $398.00 proposed penalty
Housekeeping.
Tulsa Plant · 340002630 CFR 56.20003(c) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Inspection and cover plates.
Tulsa Plant · 340002630 CFR 56.12032 · $1,320.00 proposed penalty
Operator-carrying overhead cranes.
Tulsa Plant · 340002630 CFR 56.16014(c) · $398.00 proposed penalty
Construction and maintenance of guards.
Tulsa Plant · 340002630 CFR 56.14112(b) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Construction and maintenance of guards.
Tulsa Plant · 340002630 CFR 56.14112(b) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Inspection and cover plates.
Tulsa Plant · 340002630 CFR 56.12032 · $151.00 proposed penalty
Electrical conductors.
Tulsa Plant · 340002630 CFR 56.12004 · $151.00 proposed penalty
Identification of power switches.
Tulsa Plant · 340002630 CFR 56.12018 · $504.00 proposed penalty
Safety can use.
Tulsa Plant · 340002630 CFR 56.4402 · $504.00 proposed penalty
Construction and maintenance of guards.
Tulsa Plant · 340002630 CFR 56.14112(b) · $755.00 proposed penalty
Regular Safety and Health Inspection
Tulsa Plant · 340002644.5 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Tulsa Plant · 340002630 CFR 50.30(a) · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Tulsa Plant · 340002630 CFR 56.12019 · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.