  1. Identification of power switches.

    violationRecord 5220240
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12018 · $592.00 proposed penalty

  2. Identification of power switches.

    violationRecord 5220239
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12018 · $177.00 proposed penalty

  3. Splices and repairs of power cables.

    violationRecord 5220452
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12013(a) · $151.00 proposed penalty

  4. Air receiver tanks.

    violationRecord 5220451
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.13011 · $209.00 proposed penalty

  5. Waste receptacles.

    violationRecord 5220450
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.20013 · $151.00 proposed penalty

  6. Electrical conductors.

    violationRecord 5220449
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12004 · $151.00 proposed penalty

  7. Securing gas cylinders.

    violationRecord 5220448
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.16005 · $313.00 proposed penalty

  8. Inspection and cover plates.

    violationRecord 5220238
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12032 · $398.00 proposed penalty

  9. Parking procedures for unattended equipment.

    violationRecord 5220237
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.14207 · $697.00 proposed penalty

  10. Safety defects; examination, correction and records.

    violationRecord 5220236
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.14100(b) · $151.00 proposed penalty

  11. Insulation and fittings for power wires and cables.

    violationRecord 5220235
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12008 · $209.00 proposed penalty

  12. Securing gas cylinders.

    violationRecord 5220234
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.16005 · $209.00 proposed penalty

  13. Controls and switches.

    violationRecord 5220233
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12002 · $209.00 proposed penalty

  14. First aid materials.

    violationRecord 5220232
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.15001 · $151.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord F034CB1
    Sugar Creek Ug Mine · 2302171

    78.5 on-site hours reported

  16. Spot Inspection

    inspectionRecord F03A297
    Sugar Creek Ug Mine · 2302171

    2.0 on-site hours reported

  17. Compliance Follow-up Inspection

    inspectionRecord F014DA4
    Sugar Creek Ug Mine · 2302171

    1.0 on-site hours reported

  18. Inspection of compressed-air receivers and other unfired pressure vessels.

    violationRecord 5043040
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.13015(a) · $267.00 proposed penalty

  19. Firing devices.

    violationRecord 5043039
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.6405(c) · $592.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 9768794
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.14100(b) · $267.00 proposed penalty

  21. First aid materials.

    violationRecord 9768107
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.15001 · $267.00 proposed penalty

  22. Moving machine parts.

    violationRecord 9768106
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.14107(a) · $267.00 proposed penalty

  23. Identification of power switches.

    violationRecord 5043858
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12018 · $177.00 proposed penalty

  24. Protection of persons at switchgear.

    violationRecord 5043857
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.12020 · $267.00 proposed penalty

  25. Safe access.

    violationRecord 5043856
    Sugar Creek Ug Mine · 2302171

    30 CFR 57.11001 · Significant and substantial (S&S) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.