Cemex de Puerto Rico safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Other Technical Compliance Investigations
Ponce Cement Plant · 54000010.0 on-site hours reported
Compliance Follow-up Inspection
Ponce Cement Plant · 54000013.0 on-site hours reported
Compliance Follow-up Inspection
Ponce Cement Plant · 54000012.0 on-site hours reported
Safety defects; examination, correction and records.
Ponce Cement Plant · 540000130 CFR 56.14100(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Moving machine parts.
Ponce Cement Plant · 540000130 CFR 56.14107(a) · $245.00 proposed penalty
Safety defects; examination, correction and records.
Ponce Cement Plant · 540000130 CFR 56.14100(b) · $818.00 proposed penalty
Safety defects; examination, correction and records.
Ponce Cement Plant · 540000130 CFR 56.14100(b) · $151.00 proposed penalty
Safe access.
Ponce Cement Plant · 540000130 CFR 56.11001 · $151.00 proposed penalty
Illumination of surface working areas.
Ponce Cement Plant · 540000130 CFR 56.17001 · $366.00 proposed penalty
Illumination of surface working areas.
Ponce Cement Plant · 540000130 CFR 56.17001 · $151.00 proposed penalty
Regular Safety and Health Inspection
Ponce Cement Plant · 540000129.5 on-site hours reported
Safety defects; examination, correction and records.
Ponce Cement Plant · 540000130 CFR 56.14100(b) · $245.00 proposed penalty
Regular Safety and Health Inspection
Ponce Cement Plant · 540000115.8 on-site hours reported
Handtools (nonpowered)
Ponce Cement Plant · 5400001Days away from work only
Accident narrative
Un atascamiento en la boquilla #3 de la BC-M cuando encuentra que tiene unas piedras obtruyendo, una procede a utilizar barra para desalojar la piedra. Realizando un tipo de apalancamiento ejerce presi�n sobre la barra en direccion hacia el cuando de momento esta se va en blanco, lo que hace que la mano derecha choque con la pared del bajante.
Compliance Follow-up Inspection
Ponce Cement Plant · 54000012.5 on-site hours reported
Operators stations.
Ponce Cement Plant · 540000130 CFR 56.14103(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Ponce Cement Plant · 540000114.5 on-site hours reported
Health Technical Investigation
Ponce Cement Plant · 540000120.5 on-site hours reported
Compliance Follow-up Inspection
Ponce Cement Plant · 54000011.0 on-site hours reported
Moving machine parts.
Ponce Cement Plant · 540000130 CFR 56.14107(b) · $209.00 proposed penalty
Regular Safety and Health Inspection
Ponce Cement Plant · 540000123.5 on-site hours reported
Other Technical Compliance Investigations
Ponce Cement Plant · 54000010.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.