Testing grounding systems.
Victorville Cement Plant · 040028130 CFR 56.12028 · $549.00 proposed penalty
Spillage and leakage.
Victorville Cement Plant · 040028130 CFR 56.4102 · $245.00 proposed penalty
Construction and maintenance of guards.
Victorville Cement Plant · 040028130 CFR 56.14112(b) · $959.00 proposed penalty
Stacking and storage of materials.
Victorville Cement Plant · 040028130 CFR 56.16001 · $245.00 proposed penalty
Moving machine parts.
Victorville Cement Plant · 040028130 CFR 56.14107(a) · $366.00 proposed penalty
Housekeeping.
Victorville Cement Plant · 040028130 CFR 56.20003(a) · $245.00 proposed penalty
Inspection and cover plates.
Victorville Cement Plant · 040028130 CFR 56.12032 · $245.00 proposed penalty
Regular Safety and Health Inspection
Victorville Cement Plant · 040028174.0 on-site hours reported
Safety defects; examination, correction and records.
Victorville Cement Plant · 040028130 CFR 56.14100(c) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Fixed ladder anchorage and toe clearance.
Victorville Cement Plant · 040028130 CFR 56.11005 · $245.00 proposed penalty
Stacking and storage of materials.
Victorville Cement Plant · 040028130 CFR 56.16001 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Housekeeping.
Victorville Cement Plant · 040028130 CFR 56.20003(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Insulation and fittings for power wires and cables.
Victorville Cement Plant · 040028130 CFR 56.12008 · $245.00 proposed penalty
Electrical conductors.
Victorville Cement Plant · 040028130 CFR 56.12004 · $245.00 proposed penalty
Safety defects; examination, correction and records.
Eliot Plant · 040189130 CFR 56.14100(b) · $177.00 proposed penalty
Identification of power switches.
Eliot Plant · 040189130 CFR 56.12018 · $177.00 proposed penalty
Regular Safety and Health Inspection
Eliot Plant · 040189117.0 on-site hours reported
Safety can use.
Black Mountain Quarry · 040570130 CFR 56.4402 · $151.00 proposed penalty
Examination of working places.
Black Mountain Quarry · 040570130 CFR 56.18002(a) · Significant and substantial (S&S) · $366.00 proposed penalty
Stacking and storage of materials.
Black Mountain Quarry · 040570130 CFR 56.16001 · $151.00 proposed penalty
Guarding electrical connections and resistor grids.
Black Mountain Quarry · 040570130 CFR 56.12023 · Significant and substantial (S&S) · $151.00 proposed penalty
Housekeeping.
Black Mountain Quarry · 040570130 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Stacking and storage of materials.
Black Mountain Quarry · 040570130 CFR 56.16001 · $151.00 proposed penalty
Operators stations.
Black Mountain Quarry · 040570130 CFR 56.14103(b) · $151.00 proposed penalty
Newly hired experienced miner training.
Black Mountain Quarry · 040570130 CFR 46.6(a) · $610.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.