CEMEX Construction Materials Pacific, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Eye protection.
Black Mountain Quarry · 040570130 CFR 56.15004 · $151.00 proposed penalty
Safety can use.
Black Mountain Quarry · 040570130 CFR 56.4402 · $151.00 proposed penalty
Heat sources.
Black Mountain Quarry · 040570130 CFR 56.4500 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Parking procedures for unattended equipment.
Black Mountain Quarry · 040570130 CFR 56.14207 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Inspection and cover plates.
Black Mountain Quarry · 040570130 CFR 56.12032 · $151.00 proposed penalty
Examination of working places.
Black Mountain Quarry · 040570130 CFR 56.18002(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Brakes.
Black Mountain Quarry · 040570130 CFR 56.14101(a)(3) · $151.00 proposed penalty
Construction and maintenance of guards.
Black Mountain Quarry · 040570130 CFR 56.14112(a) · $151.00 proposed penalty
Moving machine parts.
Black Mountain Quarry · 040570130 CFR 56.14107(a) · $151.00 proposed penalty
Barricades and warning signs.
Black Mountain Quarry · 040570130 CFR 56.20011 · Significant and substantial (S&S) · $209.00 proposed penalty
Construction and maintenance of guards.
Black Mountain Quarry · 040570130 CFR 56.14112(a)(1) · $151.00 proposed penalty
Construction and maintenance of guards.
Black Mountain Quarry · 040570130 CFR 56.14112(a)(1) · Significant and substantial (S&S) · $313.00 proposed penalty
Berms or guardrails.
Black Mountain Quarry · 040570130 CFR 56.9300(d) · $366.00 proposed penalty
Stacking and storage of materials.
Black Mountain Quarry · 040570130 CFR 56.16001 · $313.00 proposed penalty
Moving machine parts.
Black Mountain Quarry · 040570130 CFR 56.14107(a) · $209.00 proposed penalty
Testing grounding systems.
Black Mountain Quarry · 040570130 CFR 56.12028 · $465.00 proposed penalty
Construction and maintenance of guards.
Black Mountain Quarry · 040570130 CFR 56.14112(a)(1) · $209.00 proposed penalty
Use restrictions.
Black Mountain Quarry · 040570130 CFR 56.4400(a) · $465.00 proposed penalty
Records of training.
Black Mountain Quarry · 040570130 CFR 46.9(c)(1)(i) · $151.00 proposed penalty
Electrical conductors.
Black Mountain Quarry · 040570130 CFR 56.12004 · $465.00 proposed penalty
Regular Safety and Health Inspection
Black Mountain Quarry · 0405701105.0 on-site hours reported
Inspection and cover plates.
Black Mountain Quarry · 040570130 CFR 56.12032 · $151.00 proposed penalty
Housekeeping.
Black Mountain Quarry · 040570130 CFR 56.20003(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Inspection and cover plates.
Black Mountain Quarry · 040570130 CFR 56.12032 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Air receiver tanks.
Black Mountain Quarry · 040570130 CFR 56.13011 · $465.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.