Carmeuse Lime Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Grand River Operation · 330118436.8 on-site hours reported
Identification of power switches.
Grand River Operation · 330118430 CFR 56.12018 · $151.00 proposed penalty
Construction and maintenance of guards.
Carmeuse Lime Inc · 360001730 CFR 56.14112(a)(1) · $151.00 proposed penalty
Grounding circuit enclosures.
Carmeuse Lime Inc · 360001730 CFR 56.12025 · $151.00 proposed penalty
Regular Safety and Health Inspection
Carmeuse Lime Inc · 36000177.5 on-site hours reported
Regular Safety and Health Inspection
Savage Plant · 210309711.3 on-site hours reported
Stationary grinding machines.
Savage Plant · 210309730 CFR 56.14115(b) · $151.00 proposed penalty
Handling of materials
Savage Plant · 2103097Days restricted activity only
Accident narrative
Injured was moving a 55 gallon drum in the warehouse when the injured felt pain in knee. Incident occurred on 2/16, but not reported until 2/18 when medical attention was requested.
Responsibility for independent contractor training.
Maple Grove Operations · 330001330 CFR 46.12(b)(1) · Significant and substantial (S&S) · $697.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Grand River Operation · 33011841.0 on-site hours reported
Testing grounding systems.
Maple Grove Operations · 330001330 CFR 56.12028 · $151.00 proposed penalty
Requirement for container labels.
Maple Grove Operations · 330001330 CFR 47.41(a) · $151.00 proposed penalty
Inspection.
Maple Grove Operations · 330001330 CFR 56.4201(a)(2) · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Grand River Operation · 330118430 CFR 56.12019 · $151.00 proposed penalty
Identification of power switches.
Grand River Operation · 330118430 CFR 56.12018 · $151.00 proposed penalty
Temporary, portable containers.
Grand River Operation · 330118430 CFR 47.44(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Grand River Operation · 330118417.3 on-site hours reported
New miner training.
Maple Grove Operations · 330001330 CFR 46.5(a) · Significant and substantial (S&S) · $168.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Maple Grove Operations · 330001330 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Maple Grove Operations · 330001330 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Maple Grove Operations · 330001330 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Maple Grove Operations · 330001330 CFR 50.30(a) · $151.00 proposed penalty
High-pressure hose connections.
Maple Grove Operations · 330001330 CFR 56.13021 · $151.00 proposed penalty
Regular Safety and Health Inspection
Maple Grove Operations · 330001357.3 on-site hours reported
Firefighting, evacuation, and rescue procedures.
Maple Grove Operations · 330001330 CFR 56.4330(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.