Buchanan Minerals, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 7.5 on-site hours reported
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 8.0 on-site hours reported
Other safeguards.
Buchanan Mine #1 · 440485630 CFR 75.1403 · $818.00 proposed penalty
Other safeguards.
Buchanan Mine #1 · 440485630 CFR 75.1403 · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $336.00 proposed penalty
Mechanical equipment guards.
Buchanan Mine #1 · 440485630 CFR 75.1722(c) · $151.00 proposed penalty
Other safeguards.
Buchanan Mine #1 · 440485630 CFR 75.1403 · $245.00 proposed penalty
Mechanical equipment guards.
Buchanan Mine #1 · 440485630 CFR 75.1722(a) · $366.00 proposed penalty
Hoisting
Buchanan Mine #1 · 4404856Accident only
Accident narrative
The ABB VFD Controls were damaged during a thunder and lightning storm
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $504.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $592.00 proposed penalty
Mechanical equipment guards.
Buchanan Mine #1 · 440485630 CFR 75.1722(c) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Buchanan Mine #1 · 440485630 CFR 75.1731(b) · $193.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Buchanan Mine #1 · 440485630 CFR 75.601-1 · $177.00 proposed penalty
Condition and examination of firefighting equipment.
Buchanan Mine #1 · 440485630 CFR 75.1100-3 · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Buchanan Mine #1 · 440485630 CFR 75.1714-3(d) · $755.00 proposed penalty
Handling of materials
Buchanan Mine #1 · 4404856No dys awy frm wrk,no rstr act
Accident narrative
The injured was sliding the air lock doors open at the bottom of 9 Vent and smashed EE's right little finger between the door handle and the frame of the door. Causing a laceration the require 4 sutures to close and fracture to tip of EE's little finger.
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 7.5 on-site hours reported
Atmospheric monitoring systems.
Buchanan Mine #1 · 440485630 CFR 75.351(d)(2) · $2,503.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $1,431.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Buchanan Mine #1 · 440485630 CFR 75.1731(a) · $177.00 proposed penalty
Identification of circuit breakers.
Buchanan Mine #1 · 440485630 CFR 75.904 · $755.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
Buchanan Mine #1 · 440485630 CFR 75.1101-8(c) · $151.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Other safeguards.
Buchanan Mine #1 · 440485630 CFR 75.1403 · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.