Buchanan Minerals, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Handling of materials
Buchanan Mine #1 · 4404856No dys awy frm wrk,no rstr act
Accident narrative
The injured was replacing a damaged belt rail and as EE was replacing the rail, the employees right middle finger was caught between the top structure and the belt rail, causing a laceration which required 7 sutures to close.
Communications facilities; refuge alternatives.
Buchanan Mine #1 · 440485630 CFR 75.1600-3(a)(1) · $151.00 proposed penalty
Transformers; installation and guarding.
Buchanan Mine #1 · 440485630 CFR 77.509(c) · $592.00 proposed penalty
Transformers; installation and guarding.
Buchanan Mine #1 · 440485630 CFR 77.509(c) · $592.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 7.0 on-site hours reported
Ventilation controls.
Buchanan Mine #1 · 440485630 CFR 75.333(h) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $336.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Buchanan Mine #1 · 440485630 CFR 75.1909(a)(1) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Buchanan Mine #1 · 440485630 CFR 75.1725(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Buchanan Mine #1 · 440485630 CFR 75.512 · $193.00 proposed penalty
Low-, medium-, or high-voltage distribution circuits and equipment; repair.
Buchanan Mine #1 · 440485630 CFR 75.511 · $592.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $1,037.00 proposed penalty
Condition and examination of firefighting equipment.
Buchanan Mine #1 · 440485630 CFR 75.1100-3 · $288.00 proposed penalty
Installation of high-voltage transmission cables.
Buchanan Mine #1 · 440485630 CFR 75.807 · $177.00 proposed penalty
Examination and maintenance of firefighting equipment.
Buchanan Mine #1 · 440485630 CFR 77.1110 · $209.00 proposed penalty
Communication between shaft stations and hoist room.
Buchanan Mine #1 · 440485630 CFR 75.1402 · $14,557.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Buchanan Mine #1 · 440485630 CFR 75.512 · $3,448.00 proposed penalty
Communication between shaft stations and hoist room.
Buchanan Mine #1 · 440485630 CFR 75.1402-1 · $14,557.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $549.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 8.0 on-site hours reported
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.