Buchanan Minerals, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Map of electrical system.
Buchanan Mine #1 · 440485630 CFR 75.508 · $151.00 proposed penalty
Identification of circuit breakers and disconnecting switches.
Buchanan Mine #1 · 440485630 CFR 77.809 · $267.00 proposed penalty
Methane monitors.
Buchanan Mine #1 · 440485630 CFR 75.342(a)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $288.00 proposed penalty
Escapeways; bituminous and lignite mines.
Buchanan Mine #1 · 440485630 CFR 75.380(d)(4) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 13.8 on-site hours reported
Automatic emergency-parking brakes.
Buchanan Mine #1 · 440485630 CFR 75.523-3(c)(2) · $177.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Buchanan Mine #1 · 440485630 CFR 75.512 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Loading and haulage equipment; operation.
Buchanan Mine #1 · 440485630 CFR 77.1607(cc) · $177.00 proposed penalty
Surface installations; general.
Buchanan Mine #1 · 440485630 CFR 77.200 · $177.00 proposed penalty
Loading and haulage equipment; operation.
Buchanan Mine #1 · 440485630 CFR 77.1607(cc) · $177.00 proposed penalty
Travelways at surface installations.
Buchanan Mine #1 · 440485630 CFR 77.205(a) · $177.00 proposed penalty
Fall of roof or back
Buchanan Mine #1 · 4404856Accident only
Accident narrative
A rock fall in the intersection of 5 North Mains at break #32 in the track and belt entry. The fall extended into the left crosscut.
Non-Injury Accident Investigation
Buchanan Mine #1 · 440485630.5 on-site hours reported
Protection from falls of roof, face and ribs.
Buchanan Mine #1 · 440485630 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Violation — cited standard not reported
Buchanan Mine #1 · 4404856Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $432.00 proposed penalty
Rock dusting.
Buchanan Mine #1 · 440485630 CFR 75.402 · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
Buchanan Mine #1 · 440485630 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $4,749.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $1,679.00 proposed penalty
Surface installations; general.
Buchanan Mine #1 · 440485630 CFR 77.200 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · $642.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $755.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Buchanan Mine #1 · 440485630 CFR 75.1731(a) · $1,126.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.