Ventilation controls.
Buchanan Mine #1 · 440485630 CFR 75.333(e)(1)(ii)
Preshift examination at fixed intervals.
Buchanan Mine #1 · 440485630 CFR 75.360(a)(1)
Condition and examination of firefighting equipment.
Buchanan Mine #1 · 440485630 CFR 75.1100-3
Identification of circuit breakers.
Buchanan Mine #1 · 440485630 CFR 75.904
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 8.0 on-site hours reported
Permissible electric face equipment; maintenance.
Buchanan Mine #1 · 440485630 CFR 75.503
Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation requirements.
Buchanan Mine #1 · 440485630 CFR 75.1710-1(d)
Protection from falls of roof, face and ribs.
Buchanan Mine #1 · 440485630 CFR 75.202(a)
Ventilation controls.
Buchanan Mine #1 · 440485630 CFR 75.333(d)(3)
Machinery and equipment; operation and maintenance.
Buchanan Mine #1 · 440485630 CFR 77.404(a) · Significant and substantial (S&S)
Examination and maintenance of firefighting equipment.
Buchanan Mine #1 · 440485630 CFR 77.1110
Main mine fan stoppage with persons underground.
Buchanan Mine #1 · 440485630 CFR 75.313(c)(2)
Mechanical equipment guards.
Buchanan Mine #1 · 440485630 CFR 77.400(a)
Loading and haulage equipment; installations.
Buchanan Mine #1 · 440485630 CFR 77.1605(b)
Electric equipment; examination, testing, and maintenance.
Buchanan Mine #1 · 440485630 CFR 77.502
Explosives, handling and use.
Buchanan Mine #1 · 440485630 CFR 77.1303(d)
Explosives; magazines.
Buchanan Mine #1 · 440485630 CFR 77.1301(c)(5)
Ventilation controls.
Buchanan Mine #1 · 440485630 CFR 75.333(e)(1)(ii)
Mechanical equipment guards.
Buchanan Mine #1 · 440485630 CFR 75.1722(a)
Weekly examination.
Buchanan Mine #1 · 440485630 CFR 75.364(g)
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 6.5 on-site hours reported
Fire protection; training and organization.
Buchanan Mine #1 · 440485630 CFR 77.1100
Permissible electric face equipment; maintenance.
Buchanan Mine #1 · 440485630 CFR 75.503 · Significant and substantial (S&S)
Quantity and location of firefighting equipment.
Buchanan Mine #1 · 440485630 CFR 75.1100-2(b)
Construction and repair of seals.
Buchanan Mine #1 · 440485630 CFR 75.337(h)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.