Buchanan Minerals, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 8.0 on-site hours reported
Machinery
Buchanan Mine #1 · 4404856Perm tot or perm prtl disablty
Accident narrative
The injured was drilling into the rib to install a rib bolt, when EE was bringing the drill head back toward EE, EE caught EE's right ring finger between the inner mast and inner carriage area of drill head and the drill station frame.
Hoisting
Buchanan Mine #1 · 4404856Accident only
Accident narrative
Bad relay on the brake control that did not let it get another voltage to release the brakes. Back in operation on 5/14/26 at 9:15 AM
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $313.00 proposed penalty
Weekly examination.
Buchanan Mine #1 · 440485630 CFR 75.364(g) · $177.00 proposed penalty
Weekly examination.
Buchanan Mine #1 · 440485630 CFR 75.364(a)(1) · $177.00 proposed penalty
Smoking programs.
Buchanan Mine #1 · 440485630 CFR 75.1702-1 · $177.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 6.5 on-site hours reported
Face ventilation control devices.
Buchanan Mine #1 · 440485630 CFR 75.330(b)(2) · $151.00 proposed penalty
Inspection and cover plates.
Buchanan Mine #1 · 440485630 CFR 77.512 · $592.00 proposed penalty
Surface installations; general.
Buchanan Mine #1 · 440485630 CFR 77.200 · $267.00 proposed penalty
Dust accumulations in surface installations.
Buchanan Mine #1 · 440485630 CFR 77.202 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $1,818.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
Buchanan Mine #1 · 440485630 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Maintenance of incombustible content of rock dust.
Buchanan Mine #1 · 440485630 CFR 75.403 · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Buchanan Mine #1 · 440485630 CFR 75.1731(b) · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Buchanan Mine #1 · 440485630 CFR 75.1731(a) · $465.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $313.00 proposed penalty
Power wires and cables; insulation and protection.
Buchanan Mine #1 · 440485630 CFR 75.517 · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
Buchanan Mine #1 · 440485630 CFR 75.503 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 8.0 on-site hours reported
Permissible electric face equipment; maintenance.
Buchanan Mine #1 · 440485630 CFR 75.503 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Disconnecting devices.
Buchanan Mine #1 · 440485630 CFR 75.903 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Disconnecting devices.
Buchanan Mine #1 · 440485630 CFR 75.903 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.