Buchanan Minerals, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Power wires and cables; insulation and protection.
Buchanan Mine #1 · 440485630 CFR 75.517 · $193.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $151.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $288.00 proposed penalty
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Buchanan Mine #1 · 440485630 CFR 75.202(a) · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
Buchanan Mine #1 · 440485630 CFR 75.202(a) · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
Buchanan Mine #1 · 440485630 CFR 75.202(a) · $177.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 6.5 on-site hours reported
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $288.00 proposed penalty
Verbal Hazard Complaint Inspections
Buchanan Mine #1 · 44048563.5 on-site hours reported
Regular Safety and Health Inspection
Buchanan Mine #1 · 44048561,277.5 on-site hours reported
Verbal Hazard Complaint Inspections
Buchanan Mine #1 · 44048562.5 on-site hours reported
Accumulation of combustible materials.
Buchanan Mine #1 · 440485630 CFR 75.400 · $288.00 proposed penalty
Spot Inspection
Buchanan Mine #1 · 44048561.0 on-site hours reported
Spot Inspection
Buchanan Mine #1 · 44048568.3 on-site hours reported
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 10.0 on-site hours reported
Verbal Hazard Complaint Inspections
Buchanan Mine #1 · 44048562.0 on-site hours reported
Health Technical Investigation
Buchanan Mine #1 · 44048561.0 on-site hours reported
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 4.0 on-site hours reported
Respirable dust standards.
Buchanan Mine #1 · 440485630 CFR 70.100(a)(2) · Significant and substantial (S&S) · $592.00 proposed penalty
Respirable dust standards.
Buchanan Mine #1 · 440485630 CFR 70.100(a)(2) · Significant and substantial (S&S) · $592.00 proposed penalty
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 4.5 on-site hours reported
Spot Inspections
Buchanan Mine #1 · 4404856103(i) · 5.3 on-site hours reported
Other safeguards.
Buchanan Mine #1 · 440485630 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty
Other safeguards.
Buchanan Mine #1 · 440485630 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.