Coal production
3,683,459reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Jim Bridger Mine4800677 · Active6/8 quarters reported | Sweetwater, WYSurface · MSHA: Coal (Bituminous) | 3,683,459 | 648,252 | 10 | 6 | 545.8 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 1 mines listed under this operator were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 520,741 | 113,335 | 4.59 | 220 | 1/1 mines reporting |
| 2025 Q2 | 501,174 | 114,679 | 4.37 | 233 | 1/1 mines reporting |
| 2025 Q3 | 871,125 | 109,549 | 7.95 | 212 | 1/1 mines reporting |
| 2025 Q4 | 762,474 | 105,427 | 7.23 | 212 | 1/1 mines reporting |
| 2026 Q1 | 580,204 | 104,628 | 5.55 | 209 | 1/1 mines reporting |
| 2026 Q2 | 447,741 | 100,634 | 4.45 | 206 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
2 significant & substantial (S&S)
0 records classified as fatality
10 of 10 violations with amounts
14 inspections · 14 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 0 | 0 | — | 1 | 0 | 2 | 29.5 |
| 2025-Q2 | 0 | 0 | — | 2 | 0 | 1 | 12.8 |
| 2025-Q3 | 5 | 0 | 755.00 | 0 | 0 | 3 | 151.3 |
| 2025-Q4 | 0 | 0 | — | 1 | 0 | 2 | 137.5 |
| 2026-Q1 | 0 | 0 | — | 1 | 0 | 1 | 39.0 |
| 2026-Q2 | 5 | 2 | 3,163.00 | 0 | 0 | 1 | 143.3 |
| 2026-Q3 | 0 | 0 | — | 1 | 0 | 3 | 32.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 1 | 0.0 |
All violations issued in the selected period. Counts combine subsections.
Spot Inspection · 0.0 on-site hours
Spot Inspection · 14.5 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
The technician was changing the cutting bit on a vertical mill. When released the collets fall so you need to hold them. when EE went to release the bit EE hit the wrong button and turned the mill on catching EE's glove and pulling EE's hand into the rotating bit. EE received 21 stitches and a fractured bone.
Spot Inspection · 12.5 on-site hours
Verbal Hazard Complaint Inspections · 5.5 on-site hours
77.502 · S&S · $398.00 proposed
47.41(a) · $151.00 proposed
47.44(b) · $151.00 proposed
47.42(b) · $151.00 proposed
77.410(a)(1) · S&S · $2,312.00 proposed
Regular Safety and Health Inspection · 143.3 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
High winds blew the doors on the back of the Drag Line house open. The employee and two others decided to close the doors. They successfully closed the right door and were attempting to close the left door when a gust of wind hit the door and flung it open blowing all three of them back with the door. The employee was pinched between the door and the guarding around the Gen-set.
Spot Inspection · 39.0 on-site hours
Spot Inspection · 26.5 on-site hours
Regular Safety and Health Inspection · 111.0 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
The 103 Dragline at Ramp 53 contacted the cable handler #768 and was struck by the left rear house of the dragline while the dragline was in full swing. As a result, the cable handler was tipped onto its side. The cable handler operator was transported to the Dr. Office for further medical evaluation. On 10/13/25 the MRI confirmed that the employee would need surgery.
Spot Inspection · 25.3 on-site hours
Spot Inspection · 12.0 on-site hours
47.41(a) · $151.00 proposed
77.208(a) · $151.00 proposed
77.904 · $151.00 proposed
77.507 · $151.00 proposed
77.1109(a) · $151.00 proposed
Regular Safety and Health Inspection · 114.0 on-site hours
Spot Inspection · 12.8 on-site hours
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 576,869 | 9,111 | 0.65 | 11.51 | 59.91 | |
| 2025-Q4 | 863,207 | 9,149 | 0.63 | 11.83 | 52.65 | |
| 2026-Q1 | 529,584 | 9,193 | 0.59 | 10.97 | 50.00 | |
| 2026-Q2 | 239,298 | 9,121 | 0.56 | 11.05 | 64.28 | |
| 2026-Q3 * | 253,364 | 9,329 | 0.60 | 10.40 | 67.00 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 12478 · preliminary | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 253,364 | 67.00 | 9,329 | 0.60 | 10.40 | ContractSUB | Tram/conveyor |
| 2026-06EIA row 10530 · preliminary | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 88,844 | 67.00 | 9,037 | 0.56 | 11.40 | ContractSUB | Tram/conveyor |
| 2026-05EIA row 8643 · preliminary | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 69,070 | 67.00 | 9,133 | 0.52 | 11.00 | ContractSUB | Tram/conveyor |
| 2026-04EIA row 6866 · preliminary | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 81,384 | 59.00 | 9,202 | 0.58 | 10.70 | ContractSUB | Tram/conveyor |
| 2026-03EIA row 5035 · preliminary | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 75,148 | 59.00 | 9,035 | 0.56 | 11.90 | ContractSUB | Tram/conveyor |
| 2026-02EIA row 3133 · preliminary | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 212,497 | 59.00 | 9,274 | 0.58 | 10.50 | ContractSUB | Tram/conveyor |
| 2026-01EIA row 1157 · preliminary | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 241,939 | 39.31 | 9,171 | 0.60 | 11.10 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 35460 · final | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 224,021 | 38.83 | 9,060 | 0.70 | 12.30 | ContractSUB | Tram/conveyor |
| 2025-11EIA row 32447 · final | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 421,898 | 57.49 | 9,182 | 0.60 | 11.40 | ContractSUB | Tram/conveyor |
| 2025-10EIA row 29507 · final | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 217,288 | 57.50 | 9,176 | 0.61 | 12.20 | ContractSUB | Tram/conveyor |
| 2025-09EIA row 26455 · final | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 269,997 | 57.52 | 9,075 | 0.67 | 12.20 | ContractSUB | Tram/conveyor |
| 2025-08EIA row 23363 · final | JIM BRIDGER MINE4800677 | Jim Bridger8066 · WY · JIM BRIDGER | 306,872 | 62.01 | 9,143 | 0.64 | 10.90 | ContractSUB | Tram/conveyor |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Jim Bridger Mine4800677 · Sweetwater, Wyoming | 2,850,457 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.