Compliance Follow-up Inspection
BMC Sand Eureka Plant · 23018401.0 on-site hours reported
Regular Safety and Health Inspection
BMC Sand Eureka Plant · 230184011.0 on-site hours reported
Safety defects; examination, correction and records.
BMC Sand Eureka Plant · 230184030 CFR 56.14100(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Testing grounding systems.
BMC Sand - Old Monroe · 230220130 CFR 56.12028 · $288.00 proposed penalty
Housekeeping.
BMC Sand - Old Monroe · 230220130 CFR 56.20003(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
BMC Sand - Old Monroe · 23022018.3 on-site hours reported
Non-Chargeable Accident Investigation
BMC Sand Eureka Plant · 23018408.0 on-site hours reported
Regular Safety and Health Inspection
BMC Sand Eureka Plant · 23018408.5 on-site hours reported
Regular Safety and Health Inspection
BMC Sand - Old Monroe · 230220110.3 on-site hours reported
Testing grounding systems.
BMC Sand Eureka Plant · 230184030 CFR 56.12028 · $151.00 proposed penalty
Berms or guardrails.
BMC Sand - Old Monroe · 230220130 CFR 56.9300(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Construction and maintenance of guards.
BMC Sand - Old Monroe · 230220130 CFR 56.14112(b) · $1,431.00 proposed penalty
Berms or guardrails.
BMC Sand - Old Monroe · 230220130 CFR 56.9300 · Significant and substantial (S&S) · $432.00 proposed penalty
Housekeeping.
BMC Sand - Old Monroe · 230220130 CFR 56.20003(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Special Emphasis Programs
BMC Sand - Old Monroe · 23022011.0 on-site hours reported
Regular Safety and Health Inspection
BMC Sand Eureka Plant · 230184018.0 on-site hours reported
Machinery, equipment, and tools.
BMC Sand - Old Monroe · 230220130 CFR 56.14205 · $151.00 proposed penalty
Regular Safety and Health Inspection
BMC Sand - Old Monroe · 230220120.5 on-site hours reported
Examination of working places.
BMC Sand - Old Monroe · 230220130 CFR 56.18002(a) · $151.00 proposed penalty
General requirements for boilers and pressure vessels.
BMC Sand - Old Monroe · 230220130 CFR 56.13001 · $151.00 proposed penalty
Handrails and toeboards.
BMC Sand - Old Monroe · 230220130 CFR 56.11002 · Significant and substantial (S&S) · $151.00 proposed penalty
Safe access.
BMC Sand - Old Monroe · 230220130 CFR 56.11001 · $151.00 proposed penalty
Moving machine parts.
BMC Sand - Old Monroe · 230220130 CFR 56.14107(a) · $151.00 proposed penalty
Moving machine parts.
BMC Sand - Old Monroe · 230220130 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
BMC Sand - Old Monroe · 23022016.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.