Bluestone Oil Corp safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Ranger Fuel Preparation Plant · 46058688.5 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
Ranger Fuel Preparation Plant · 460586830 CFR 77.216(d)
Inspection and cover plates.
Ranger Fuel Preparation Plant · 460586830 CFR 77.512
Travelways at surface installations.
Ranger Fuel Preparation Plant · 460586830 CFR 77.205(b)
Impoundment Spot Inspection
Ranger Fuel Preparation Plant · 46058682.5 on-site hours reported
Regular Safety and Health Inspection
Ranger Fuel No. 1 Mine · 46092222.0 on-site hours reported
Regular Safety and Health Inspection
Ranger Fuel Preparation Plant · 46058683.0 on-site hours reported
Mine Idle Activity
Ranger Fuel Preparation Plant · 46058682.5 on-site hours reported
Regular Safety and Health Inspection
Ranger Fuel No. 1 Mine · 46092220.8 on-site hours reported
Impoundment Spot Inspection
Ranger Fuel Preparation Plant · 46058683.0 on-site hours reported
Regular Safety and Health Inspection
Ranger Fuel No. 1 Mine · 46092221.0 on-site hours reported
Regular Safety and Health Inspection
Ranger Fuel Preparation Plant · 460586812.0 on-site hours reported
Illumination.
Ranger Fuel Preparation Plant · 460586830 CFR 77.207 · $151.00 proposed penalty
Electric equipment; frequency of examination and testing.
Ranger Fuel Preparation Plant · 460586830 CFR 77.502-2 · $151.00 proposed penalty
Regular Safety and Health Inspection
Ranger Fuel No. 1 Mine · 46092221.5 on-site hours reported
Spot Inspection
Ranger Fuel Preparation Plant · 460586813.0 on-site hours reported
Impoundment Spot Inspection
Ranger Fuel Preparation Plant · 46058682.5 on-site hours reported
Experienced miner training.
Ranger Fuel Preparation Plant · 460586830 CFR 48.26(b) · Significant and substantial (S&S) · $775.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
Ranger Fuel Preparation Plant · 460586830 CFR 77.1713(a) · $151.00 proposed penalty
Electric equipment; frequency of examination and testing.
Ranger Fuel Preparation Plant · 460586830 CFR 77.502-2 · $151.00 proposed penalty
Spot Inspection
Ranger Fuel Preparation Plant · 46058689.8 on-site hours reported
Hoisting of materials.
Ranger Fuel Preparation Plant · 460586830 CFR 77.210(a) · Significant and substantial (S&S) · $1,866.00 proposed penalty
Hazard training.
Ranger Fuel Preparation Plant · 460586830 CFR 48.31(a) · Significant and substantial (S&S) · $5,716.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
Ranger Fuel Preparation Plant · 460586830 CFR 77.1713(a) · Significant and substantial (S&S) · $5,716.00 proposed penalty
Protective clothing; requirements.
Ranger Fuel Preparation Plant · 460586830 CFR 77.1710(g) · Significant and substantial (S&S) · $1,723.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.