Blue Mountain Production Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Slip or fall of person
Jasper Creek Mine · 2200582Days away from work only
Accident narrative
Teammate tripped and fell over a parking bumper while walking in the parking lot
Examination of working places.
Jasper Creek Mine · 220058230 CFR 56.18002(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Brakes.
Jasper Creek Mine · 220058230 CFR 56.14101(a)(2) · $151.00 proposed penalty
Horns and backup alarms.
Jasper Creek Mine · 220058230 CFR 56.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Jasper Creek Mine · 220058217.3 on-site hours reported
Spot Inspection
Jasper Creek Mine · 22005820.5 on-site hours reported
Regular Safety and Health Inspection
Jasper Creek Mine · 22005829.3 on-site hours reported
Self-propelled equipment.
Jasper Creek Mine · 220058230 CFR 56.4230(a)(1) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Jasper Creek Mine · 220058230 CFR 50.30(a) · $151.00 proposed penalty
Annual refresher training.
Jasper Creek Mine · 220058230 CFR 46.8 · $197.00 proposed penalty
Safety defects; examination, correction and records.
Jasper Creek Mine · 220058230 CFR 56.14100(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
Jasper Creek Mine · 220058210.0 on-site hours reported
Spot Inspection
Jasper Creek Mine · 22005828.0 on-site hours reported
Non-Fatal Accident Investigation
Jasper Creek Mine · 22005826.0 on-site hours reported
Procedures during repairs or maintenance.
Jasper Creek Mine · 220058230 CFR 56.14105 · Significant and substantial (S&S) · $697.00 proposed penalty
Handling of materials
Jasper Creek Mine · 2200582No dys awy frm wrk,no rstr act
Accident narrative
While making adjustment on the Case Packer hand slipped and hit the guide which caused the injury.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.