← Black Hills Bentonite-A Limited Liability Co

Black Hills Bentonite-A Limited Liability Co safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F01255D
    WORLAND PLANT · 4800987

    6.5 on-site hours reported

  2. Construction and maintenance of guards.

    violationRecord 5051513
    WORLAND PLANT · 4800987

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  3. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F01255C
    WORLAND PLANT · 4800987

    11.0 on-site hours reported

  4. Handling of materials

    accidentRecord 220250590020
    WORLAND PLANT · 4800987

    Days away from work only

    Accident narrative

    EE was trying to clear an elevator bucket from a screw. Another EE was twisting the drive belt when first EE pulled the bucket out, causing the screw to rotate. The screw hit the first EE's left hand. First EE suffered a broken hand and laceration.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.