Regular Safety and Health Inspection
BPM Colony Mine · 480088920.3 on-site hours reported
Safety defects; examination, correction and records.
BPM Colony Mill · 480007030 CFR 56.14100(b) · $151.00 proposed penalty
Housekeeping.
BPM Colony Mill · 480007030 CFR 56.20003(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
BPM Colony Mill · 480007019.0 on-site hours reported
Testing grounding systems.
BPM Colony Mill · 480007030 CFR 56.12028 · $151.00 proposed penalty
Access to stationary electrical equipment or switchgear.
BPM Colony Mill · 480007030 CFR 56.12019 · $151.00 proposed penalty
Regular Safety and Health Inspection
BPM Lovell Mine · 48010168.0 on-site hours reported
Insulation and fittings for power wires and cables.
BPM Lovell Mill · 480140530 CFR 56.12008 · $151.00 proposed penalty
Parking procedures for unattended equipment.
BPM Lovell Mill · 480140530 CFR 56.14207 · $151.00 proposed penalty
Self-propelled equipment.
BPM Lovell Mill · 480140530 CFR 56.4230(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
BPM Lovell Mill · 480140519.0 on-site hours reported
Other
BPM Lovell Mill · 4801405Injuries due to natural causes
Accident narrative
Personal Health Issue not due to any chemical or physical factor from the mine. Only one person affected by this personal medical condition.
Verbal Hazard Complaint Inspections
BPM Lovell Mill · 48014051.5 on-site hours reported
Regular Safety and Health Inspection
BPM Colony Mill · 480007012.0 on-site hours reported
Brakes.
BPM Colony Mill · 480007030 CFR 56.14101(a)(2) · $151.00 proposed penalty
Spillage and leakage.
BPM Colony Mill · 480007030 CFR 56.4102 · $151.00 proposed penalty
Safety defects; examination, correction and records.
BPM Colony Mill · 480007030 CFR 56.14100(b) · $151.00 proposed penalty
Spillage and leakage.
BPM Colony Mill · 480007030 CFR 56.4102 · $151.00 proposed penalty
Criteria—MSHA Form 7000-1, Section D.
BPM Colony Mine · 480088930 CFR 50.20-7(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
BPM Colony Mine · 480088919.0 on-site hours reported
Horns and backup alarms.
BPM Lovell Mine · 480101630 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty
Regular Safety and Health Inspection
BPM Lovell Mine · 48010169.3 on-site hours reported
Testing grounding systems.
BPM Lovell Mill · 480140530 CFR 56.12028 · $151.00 proposed penalty
Electrical conductors.
BPM Lovell Mill · 480140530 CFR 56.12004 · $151.00 proposed penalty
Horns and backup alarms.
BPM Lovell Mill · 480140530 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.