Benton County Stone Co Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Rockin E · 34021138.0 on-site hours reported
Warning signs.
Rockin E · 340211330 CFR 56.4101 · $151.00 proposed penalty
Horns and backup alarms.
Rockin E · 340211330 CFR 56.14132(a) · $151.00 proposed penalty
Work on electrically-powered equipment.
BENTON CO STONE INC · 030173030 CFR 56.12016 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Requirement for container labels.
BENTON CO STONE INC · 030173030 CFR 47.41(a) · $177.00 proposed penalty
Barricades and warning signs.
BENTON CO STONE INC · 030173030 CFR 56.20011 · $592.00 proposed penalty
Safety defects; examination, correction and records.
BENTON CO STONE INC · 030173030 CFR 56.14100(b) · $177.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
BENTON CO STONE INC · 03017301.8 on-site hours reported
Regular Safety and Health Inspection
BENTON CO STONE INC · 030173011.0 on-site hours reported
General requirements.
BENTON CO STONE INC · 030173030 CFR 56.4200(b)(2) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
BENTON CO STONE INC · 030173030 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
BENTON CO STONE INC · 030173030 CFR 50.30(a) · $151.00 proposed penalty
Housekeeping.
BENTON CO STONE INC · 030173030 CFR 56.20003(a) · $177.00 proposed penalty
Moving machine parts.
BENTON CO STONE INC · 030173030 CFR 56.14107(a) · $177.00 proposed penalty
Regular Safety and Health Inspection
Seligman Quarry · 23025843.3 on-site hours reported
Construction and maintenance of guards.
Seligman Quarry · 230258430 CFR 56.14112(a)(1) · $151.00 proposed penalty
Powered haulage
BENTON CO STONE INC · 0301730Perm tot or perm prtl disablty
Accident narrative
Injured EE(1) instructed EE(2)(Tower Operator) to bump the conveyor on to dislodge a rock. EE(1) had gone back to the tail-pulley and after the "bump" saw a rock and reached in to remove it, at that moment EE(2) "bumped" the conveyor again, pinching EE(1)'s left index finger in the pulley.
Regular Safety and Health Inspection
Seligman Quarry · 23025843.8 on-site hours reported
Moving machine parts.
Seligman Quarry · 230258430 CFR 56.14107(a) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
BENTON CO STONE INC · 030173030 CFR 56.12008 · $151.00 proposed penalty
Correction of dangerous conditions.
BENTON CO STONE INC · 030173030 CFR 56.12030 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Regular Safety and Health Inspection
BENTON CO STONE INC · 030173019.0 on-site hours reported
Roll-over protective structures (ROPS) and seat belts.
BENTON CO STONE INC · 030173030 CFR 56.14130(b) · $151.00 proposed penalty
Machinery
BENTON CO STONE INC · 0301730No dys awy frm wrk,no rstr act
Accident narrative
Cleaning threads on a bolt using an impact-wrench and an open-end wrench along with penetrating oil when open-end wrench slipped in hand under power from impact wrench striking the face
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.