BELDON PROCESSING LLC. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspection
PLANT NO. 1 · 44074141.0 on-site hours reported
Spot Inspection
NO. 2 · 15198701.0 on-site hours reported
Spot Inspection
PLANT NO. 1 · 44074145.0 on-site hours reported
Spot Inspection
NO. 2 · 15198701.0 on-site hours reported
Regular Safety and Health Inspection
PLANT NO. 1 · 44074142.0 on-site hours reported
Spot Inspection
PLANT NO. 1 · 44074144.0 on-site hours reported
Spot Inspection
PLANT NO. 1 · 44074142.5 on-site hours reported
Spot Inspection
NO. 2 · 15198701.0 on-site hours reported
Regular Safety and Health Inspection
PLANT NO. 1 · 44074141.0 on-site hours reported
Spot Inspection
PLANT NO. 1 · 44074142.3 on-site hours reported
Loading and haulage equipment; installations.
PLANT NO. 1 · 440741430 CFR 77.1605(a) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
PLANT NO. 1 · 440741430 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
PLANT NO. 1 · 440741430 CFR 77.1605(b) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
PLANT NO. 1 · 440741430 CFR 50.30(a) · $151.00 proposed penalty
Booms and masts; minimum distance from high-voltage lines.
PLANT NO. 1 · 440741430 CFR 77.807-2 · Significant and substantial (S&S) · $432.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
PLANT NO. 1 · 440741430 CFR 77.516 · $151.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
PLANT NO. 1 · 440741430 CFR 77.1713(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Travelways at surface installations.
PLANT NO. 1 · 440741430 CFR 77.205(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
PLANT NO. 1 · 440741430 CFR 77.516 · $151.00 proposed penalty
Transformers; installation and guarding.
PLANT NO. 1 · 440741430 CFR 77.509(c) · $151.00 proposed penalty
Cable fittings; suitability.
PLANT NO. 1 · 440741430 CFR 77.505 · $151.00 proposed penalty
Travelways at surface installations.
PLANT NO. 1 · 440741430 CFR 77.205(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Accumulations of combustible materials.
PLANT NO. 1 · 440741430 CFR 77.1104 · $151.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
PLANT NO. 1 · 440741430 CFR 77.1713(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Regular Safety and Health Inspection
PLANT NO. 1 · 440741476.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.