Accumulation of combustible materials.
Bedrock No. 1 · 460939230 CFR 75.400 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Bedrock No. 1 · 460939230 CFR 75.370(a)(1) · $151.00 proposed penalty
Emergency tethers.
Bedrock No. 1 · 460939230 CFR 75.1714-6 · $151.00 proposed penalty
Violation — cited standard not reported
Bedrock No. 1 · 4609392$168.00 proposed penalty
Regular Safety and Health Inspection
Bedrock No. 1 · 460939260.3 on-site hours reported
Multi-gas detectors.
Bedrock No. 1 · 460939230 CFR 75.1714-7(c) · $151.00 proposed penalty
Roof bolting.
Bedrock No. 1 · 460939230 CFR 75.204(c)(1) · $151.00 proposed penalty
Spot Inspection
Bedrock No. 1 · 46093923.8 on-site hours reported
Mine ventilation plan; submission and approval.
Bedrock No. 1 · 460939230 CFR 75.370(a)(1) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Bedrock No. 1 · 46093923.0 on-site hours reported
Machinery and equipment; operation and maintenance.
Bedrock No. 1 · 460939230 CFR 75.1725(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bedrock No. 1 · 460939230 CFR 75.1725(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
Bedrock No. 1 · 460939230 CFR 72.630(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bedrock No. 1 · 460939230 CFR 75.512 · $151.00 proposed penalty
Mining methods.
Bedrock No. 1 · 460939230 CFR 75.203(b) · $151.00 proposed penalty
Roof control plan.
Bedrock No. 1 · 460939230 CFR 75.220(a)(1) · Significant and substantial (S&S) · $193.00 proposed penalty
Status change reports.
Bedrock No. 1 · 460939230 CFR 70.212(a) · $151.00 proposed penalty
Travelways at surface installations.
Bedrock No. 1 · 460939230 CFR 77.205(e) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Bedrock No. 1 · 460939230 CFR 75.512 · $151.00 proposed penalty
Accumulation of combustible materials.
Bedrock No. 1 · 460939230 CFR 75.400 · $151.00 proposed penalty
Roof control plan.
Bedrock No. 1 · 460939230 CFR 75.220(a)(1) · Significant and substantial (S&S) · $151.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
Bedrock No. 1 · 460939230 CFR 77.701 · $151.00 proposed penalty
Regular Safety and Health Inspection
Bedrock No. 1 · 460939237.5 on-site hours reported
Spot Inspection
Bedrock No. 1 · 46093923.3 on-site hours reported
Verbal Hazard Complaint Inspections
Bedrock No. 1 · 46093924.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.