Bedrock Resources, Inc. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5131756
    Bedrock No. 1 · 4609392

    30 CFR 75.400 · $151.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5131755
    Bedrock No. 1 · 4609392

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  3. Emergency tethers.

    violationRecord 5131754
    Bedrock No. 1 · 4609392

    30 CFR 75.1714-6 · $151.00 proposed penalty

  4. Violation — cited standard not reported

    violationRecord 5131753
    Bedrock No. 1 · 4609392

    $168.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F03DF6F
    Bedrock No. 1 · 4609392

    60.3 on-site hours reported

  6. Multi-gas detectors.

    violationRecord 5131752
    Bedrock No. 1 · 4609392

    30 CFR 75.1714-7(c) · $151.00 proposed penalty

  7. Roof bolting.

    violationRecord 5131751
    Bedrock No. 1 · 4609392

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  8. Spot Inspection

    inspectionRecord F01AABA
    Bedrock No. 1 · 4609392

    3.8 on-site hours reported

  9. Mine ventilation plan; submission and approval.

    violationRecord 5091686
    Bedrock No. 1 · 4609392

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  10. Verbal Hazard Complaint Inspections

    inspectionRecord F013A17
    Bedrock No. 1 · 4609392

    3.0 on-site hours reported

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5132112
    Bedrock No. 1 · 4609392

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  12. Machinery and equipment; operation and maintenance.

    violationRecord 5132111
    Bedrock No. 1 · 4609392

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  13. Drill dust control at underground areas of underground mines.

    violationRecord 5132110
    Bedrock No. 1 · 4609392

    30 CFR 72.630(b) · Significant and substantial (S&S) · $151.00 proposed penalty

  14. Electric equipment; examination, testing and maintenance.

    violationRecord 5132522
    Bedrock No. 1 · 4609392

    30 CFR 75.512 · $151.00 proposed penalty

  15. Mining methods.

    violationRecord 5132521
    Bedrock No. 1 · 4609392

    30 CFR 75.203(b) · $151.00 proposed penalty

  16. Roof control plan.

    violationRecord 5132520
    Bedrock No. 1 · 4609392

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $193.00 proposed penalty

  17. Status change reports.

    violationRecord 5132519
    Bedrock No. 1 · 4609392

    30 CFR 70.212(a) · $151.00 proposed penalty

  18. Travelways at surface installations.

    violationRecord 5132518
    Bedrock No. 1 · 4609392

    30 CFR 77.205(e) · $151.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5132517
    Bedrock No. 1 · 4609392

    30 CFR 75.512 · $151.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5132516
    Bedrock No. 1 · 4609392

    30 CFR 75.400 · $151.00 proposed penalty

  21. Roof control plan.

    violationRecord 5132515
    Bedrock No. 1 · 4609392

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $151.00 proposed penalty

  22. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5132514
    Bedrock No. 1 · 4609392

    30 CFR 77.701 · $151.00 proposed penalty

  23. Regular Safety and Health Inspection

    inspectionRecord F010C66
    Bedrock No. 1 · 4609392

    37.5 on-site hours reported

  24. Spot Inspection

    inspectionRecord F020A5D
    Bedrock No. 1 · 4609392

    3.3 on-site hours reported

  25. Verbal Hazard Complaint Inspections

    inspectionRecord 7049075
    Bedrock No. 1 · 4609392

    4.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.