Compliance Follow-up Inspection
ROUTE 32 PLANT · 06004451.5 on-site hours reported
Regular Safety and Health Inspection
ROUTE 74 PLANT · 060066114.3 on-site hours reported
Housekeeping.
ROUTE 74 PLANT · 060066130 CFR 56.20003(a)
Moving machine parts.
ROUTE 74 PLANT · 060066130 CFR 56.14107(a)
Construction and maintenance of guards.
ROUTE 74 PLANT · 060066130 CFR 56.14112(b)
Moving machine parts.
ROUTE 74 PLANT · 060066130 CFR 56.14107(a)
Moving machine parts.
ROUTE 74 PLANT · 060066130 CFR 56.14107(a)
Grounding circuit enclosures.
ROUTE 74 PLANT · 060066130 CFR 56.12025
Testing grounding systems.
ROUTE 32 PLANT · 060044530 CFR 56.12028
Regular Safety and Health Inspection
ROUTE 32 PLANT · 060044511.3 on-site hours reported
Moving machine parts.
ROUTE 32 PLANT · 060044530 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of guards.
ROUTE 32 PLANT · 060044530 CFR 56.14112(a)(1) · $151.00 proposed penalty
Construction and maintenance of guards.
ROUTE 32 PLANT · 060044530 CFR 56.14112(a)(1) · $151.00 proposed penalty
Moving machine parts.
ROUTE 32 PLANT · 060044530 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of guards.
ROUTE 32 PLANT · 060044530 CFR 56.14112(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
ROUTE 74 PLANT · 06006617.0 on-site hours reported
Regular Safety and Health Inspection
ROUTE 32 PLANT · 06004457.0 on-site hours reported
Regular Safety and Health Inspection
ROUTE 32 PLANT · 06004454.8 on-site hours reported
Regular Safety and Health Inspection
ROUTE 74 PLANT · 06006616.5 on-site hours reported
Inspection and cover plates.
ROUTE 32 PLANT · 060044530 CFR 56.12032 · $151.00 proposed penalty
Construction and maintenance of guards.
ROUTE 32 PLANT · 060044530 CFR 56.14112(b) · $151.00 proposed penalty
Identification of power switches.
ROUTE 32 PLANT · 060044530 CFR 56.12018 · $151.00 proposed penalty
Identification of power switches.
ROUTE 74 PLANT · 060066130 CFR 56.12018 · $151.00 proposed penalty
Protection of power conductors from mobile equipment.
ROUTE 74 PLANT · 060066130 CFR 56.12005 · $151.00 proposed penalty
Construction and maintenance of guards.
ROUTE 74 PLANT · 060066130 CFR 56.14112(a) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.