Regular Safety and Health Inspection
Salado USA · 410421611.3 on-site hours reported
Moving machine parts.
Salado USA · 410421630 CFR 56.14107(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Waste receptacles.
Salado USA · 410421630 CFR 56.20013 · $245.00 proposed penalty
Inspection and cover plates.
Salado USA · 410421630 CFR 56.12032 · $245.00 proposed penalty
Waste receptacles.
Salado USA · 410421630 CFR 56.20013 · $245.00 proposed penalty
Operating speeds and control of equipment.
Salado USA · 410421630 CFR 56.9101 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Investigation.
Salado USA · 410421630 CFR 50.11(b) · $151.00 proposed penalty
Records of training.
Salado USA · 410421630 CFR 46.9(b)(2) · $151.00 proposed penalty
Violation — cited standard not reported
Salado USA · 4104216$151.00 proposed penalty
Requirement for an MSDS.
Salado USA · 410421630 CFR 47.51 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Salado USA · 410421630 CFR 50.30(a) · $151.00 proposed penalty
General instructions for completing MSHA Form 7000-1.
Salado USA · 410421630 CFR 50.20-1 · $151.00 proposed penalty
Traffic control.
Salado USA · 410421630 CFR 56.9100(a) · $151.00 proposed penalty
Splices and repairs of power cables.
Salado USA · 410421630 CFR 56.12013 · $151.00 proposed penalty
Inspection.
Salado USA · 410421630 CFR 56.4201(a)(2) · $151.00 proposed penalty
Inspection and cover plates.
Salado USA · 410421630 CFR 56.12032 · $151.00 proposed penalty
Housekeeping.
Salado USA · 410421630 CFR 56.20003(a) · $151.00 proposed penalty
Splices and repairs of power cables.
Salado USA · 410421630 CFR 56.12013(c) · $151.00 proposed penalty
Moving machine parts.
Salado USA · 410421630 CFR 56.14107(b) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Salado USA · 410421630 CFR 56.12008 · $151.00 proposed penalty
Inspection and cover plates.
Salado USA · 410421630 CFR 56.12032 · $151.00 proposed penalty
Temporary, portable containers.
Salado USA · 410421630 CFR 47.44(b) · $151.00 proposed penalty
Barricades and warning signs.
Salado USA · 410421630 CFR 56.20011 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Salado USA · 410421630 CFR 56.14207 · Significant and substantial (S&S) · $226.00 proposed penalty
Horns and backup alarms.
Salado USA · 410421630 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.