Regular Safety and Health Inspection
Salado USA · 41042169.0 on-site hours reported
Safety defects; examination, correction and records.
Salado USA · 410421630 CFR 56.14100(c) · $313.00 proposed penalty
Waste receptacles.
Salado USA · 410421630 CFR 56.20013 · $313.00 proposed penalty
Safe access.
Salado USA · 410421630 CFR 56.11001 · $313.00 proposed penalty
Temporary, portable containers.
Salado USA · 410421630 CFR 47.44(a)(2) · $313.00 proposed penalty
Regular Safety and Health Inspection
Salado USA · 41042168.5 on-site hours reported
Machinery, equipment, and tools.
Salado USA · 410421630 CFR 56.14205 · $313.00 proposed penalty
Correction of dangerous conditions.
Salado USA · 410421630 CFR 56.12030 · $313.00 proposed penalty
Electrical conductors.
Salado USA · 410421630 CFR 56.12004 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Electrical conductors.
Salado USA · 410421630 CFR 56.12004 · $465.00 proposed penalty
Inspection and cover plates.
Salado USA · 410421630 CFR 56.12032 · $313.00 proposed penalty
Insulation and fittings for power wires and cables.
Salado USA · 410421630 CFR 56.12008 · $465.00 proposed penalty
Taglines, hitches, and slings.
Salado USA · 410421630 CFR 56.16007(b) · $313.00 proposed penalty
Requirement for container labels.
Salado USA · 410421630 CFR 47.41(a)(1) · $313.00 proposed penalty
Securing gas cylinders.
Salado USA · 410421630 CFR 56.16005 · $313.00 proposed penalty
Insulation and fittings for power wires and cables.
Salado USA · 410421630 CFR 56.12008 · $313.00 proposed penalty
First-aid materials.
Salado USA · 410421630 CFR 56.15001 · $313.00 proposed penalty
Requirements for written safety program.
Salado USA · 410421630 CFR 56.23003(b) · $151.00 proposed penalty
Safe access.
Salado USA · 410421630 CFR 56.11001 · $313.00 proposed penalty
Correction of dangerous conditions.
Salado USA · 410421630 CFR 56.12030 · $313.00 proposed penalty
Electrical conductors.
Salado USA · 410421630 CFR 56.12004 · $313.00 proposed penalty
Electrical conductors.
Salado USA · 410421630 CFR 56.12004 · $313.00 proposed penalty
Machinery, equipment, and tools.
Salado USA · 410421630 CFR 56.14205 · $313.00 proposed penalty
Verbal Hazard Complaint Inspections
Salado USA · 41042164.0 on-site hours reported
First-aid materials.
Salado USA · 410421630 CFR 56.15001 · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.