Examination of working places.
PLANT #2 · 140145630 CFR 56.18002(a) · $1,679.00 proposed penalty
Electrical conductors.
PLANT #2 · 140145630 CFR 56.12004 · $504.00 proposed penalty
Safety defects; examination, correction and records.
PLANT #2 · 140145630 CFR 56.14100(c) · $226.00 proposed penalty
Electrical conductors.
PLANT #2 · 140145630 CFR 56.12004 · $504.00 proposed penalty
Construction and maintenance of guards.
PLANT #2 · 140145630 CFR 56.14112(b) · $226.00 proposed penalty
Electrical conductors.
PLANT #2 · 140145630 CFR 56.12004 · $504.00 proposed penalty
Insulation and fittings for power wires and cables.
PLANT #2 · 140145630 CFR 56.12008 · $504.00 proposed penalty
Electrical conductors.
PLANT #2 · 140145630 CFR 56.12004 · $504.00 proposed penalty
Construction and maintenance of guards.
PLANT #2 · 140145630 CFR 56.14112(b) · $226.00 proposed penalty
Grounding circuit enclosures.
PLANT #2 · 140145630 CFR 56.12025 · $818.00 proposed penalty
Spillage and leakage.
PLANT #2 · 140145630 CFR 56.4102 · $245.00 proposed penalty
Moving machine parts.
PLANT #2 · 140145630 CFR 56.14107(a) · $366.00 proposed penalty
Brakes.
PLANT #2 · 140145630 CFR 56.14101(a)(2) · $245.00 proposed penalty
Safety belts and lines.
PLANT #2 · 140145630 CFR 56.15005 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Safety defects; examination, correction and records.
PLANT #2 · 140145630 CFR 56.14100(b) · $818.00 proposed penalty
Brakes.
PLANT #2 · 140145630 CFR 56.14101(a)(2) · $818.00 proposed penalty
Warning signs.
PLANT #2 · 140145630 CFR 56.4101 · $245.00 proposed penalty
Regular Safety and Health Inspection
PLANT #2 · 140145620.0 on-site hours reported
Slip or fall of person
PLANT #2 · 1401456Dys awy frm wrk & restrctd act
Accident narrative
Was shutting off water pump after filling the water tuck. Was walking back to the truck, stepped on a rock, which caused them to stumble, they felt a pop and had some pain. Told a supervisor about it, thought they had sprain an ankle. As the day went on the pain became worse and they sought medical treatment.
Handtools (nonpowered)
PLANT #2 · 1401456No dys awy frm wrk,no rstr act
Accident narrative
Was shoveling out mud out of the secondary crusher when the shovel hit the inside of the lip on the crusher causing the shovel to stop abruptly and bending their right wrist back causing immediate pain.
Compliance Follow-up Inspection
Plant #3 · 14015870.8 on-site hours reported
Regular Safety and Health Inspection
Plant #3 · 14015876.0 on-site hours reported
Safety defects; examination, correction and records.
Plant #3 · 140158730 CFR 56.14100(b) · $245.00 proposed penalty
Regular Safety and Health Inspection
Portable Plant #5 · 14017478.8 on-site hours reported
Moving machine parts.
Portable Plant #5 · 140174730 CFR 56.14107(a) · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.