← BATTLETOWN MATERIALS, LLC

BATTLETOWN MATERIALS, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Safety defects; examination, correction and records.

    violationRecord 9998630
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.14100(b) · $151.00 proposed penalty

  2. Moving machine parts.

    violationRecord 9998629
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  3. Moving machine parts.

    violationRecord 9998628
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  4. Moving machine parts.

    violationRecord 9998627
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 9998626
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.14112(b) · $151.00 proposed penalty

  6. Guarding around lights.

    violationRecord 9998625
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.12034 · $151.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 9998622
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.14100(b) · $151.00 proposed penalty

  8. Requirement for container labels.

    violationRecord 9998620
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 47.41(a) · $151.00 proposed penalty

  9. Securing gas cylinders.

    violationRecord 9998619
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.16005 · $151.00 proposed penalty

  10. Testing grounding systems.

    violationRecord 9998618
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.12028 · $151.00 proposed penalty

  11. Requirement for container labels.

    violationRecord 9998617
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 47.41(a) · $151.00 proposed penalty

  12. Testing grounding systems.

    violationRecord 9998616
    BATTLETOWN MATERIALS, LLC · 1518147

    30 CFR 56.12028 · $151.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord F0044BA
    BATTLETOWN MATERIALS, LLC · 1518147

    70.3 on-site hours reported

  14. Slip or fall of person

    accidentRecord 220250870005
    BATTLETOWN QUARRY · 1500040

    Days away from work only

    Accident narrative

    Employee was ascending an access ladder to the right-hand side of a 992K Cat loader to check engine fluid levels. Their left hand slipped on the wet hand hold on the ladder, they used their right arm to correct the fall. In the process they aggravated a previous non work shoulder injury.

  15. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 7041732
    BATTLETOWN QUARRY · 1500040

    3.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.