← Bandmill Coal, LLC

Bandmill Coal, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Examination and maintenance of firefighting equipment.

    violationRecord 9838435
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1110 · $151.00 proposed penalty

  2. Examination and maintenance of firefighting equipment.

    violationRecord 9838434
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1110 · $151.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 9838433
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.404(a) · $151.00 proposed penalty

  4. Quantity and location of firefighting equipment.

    violationRecord 9838432
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1109(c)(1) · $151.00 proposed penalty

  5. Accumulations of combustible materials.

    violationRecord 9838431
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1104 · $151.00 proposed penalty

  6. Quantity and location of firefighting equipment.

    violationRecord 9838430
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1109(e)(1) · $151.00 proposed penalty

  7. Accumulations of combustible materials.

    violationRecord 9838429
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1104 · $151.00 proposed penalty

  8. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9838428
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1606(c) · $288.00 proposed penalty

  9. Loading and haulage equipment; installations.

    violationRecord 9838427
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1605(a) · $151.00 proposed penalty

  10. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9838426
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1606(c) · $288.00 proposed penalty

  11. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F006C7D
    Rum Creek Preparation Plant · 4605086

    3.8 on-site hours reported

  12. Insulating mats at power switches.

    violationRecord 9839302
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.513 · $151.00 proposed penalty

  13. Escape and evacuation; plan.

    violationRecord 9839301
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1101(c) · $336.00 proposed penalty

  14. Travelways at surface installations.

    violationRecord 9839300
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(b) · Significant and substantial (S&S) · $504.00 proposed penalty

  15. Travelways at surface installations.

    violationRecord 9836799
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(b) · Significant and substantial (S&S) · $504.00 proposed penalty

  16. Examination and maintenance of firefighting equipment.

    violationRecord 9836798
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1110 · $151.00 proposed penalty

  17. Electric equipment; examination, testing, and maintenance.

    violationRecord 9836797
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.502 · $151.00 proposed penalty

  18. Impoundment Spot Inspection

    inspectionRecord F0128E6
    Rum Creek Preparation Plant · 4605086

    3.5 on-site hours reported

  19. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 7034320
    Rum Creek Preparation Plant · 4605086

    9.8 on-site hours reported

  20. Travelways at surface installations.

    violationRecord 9835645
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(d) · $151.00 proposed penalty

  21. Mechanical equipment guards.

    violationRecord 9835644
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.400(d) · $151.00 proposed penalty

  22. Travelways at surface installations.

    violationRecord 9835643
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(d) · Significant and substantial (S&S) · $504.00 proposed penalty

  23. Mechanical equipment guards.

    violationRecord 9835642
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.400(b) · $151.00 proposed penalty

  24. Travelways at surface installations.

    violationRecord 9835640
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(d) · Significant and substantial (S&S) · $504.00 proposed penalty

  25. Travelways at surface installations.

    violationRecord 9835639
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(d) · Significant and substantial (S&S) · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.