← Bandmill Coal, LLC

Bandmill Coal, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Loading and haulage equipment; installations.

    violationRecord 5096294
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1605(a) · $151.00 proposed penalty

  2. Examination and maintenance of firefighting equipment.

    violationRecord 5096293
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1110 · $151.00 proposed penalty

  3. Loading and haulage equipment; installations.

    violationRecord 5096292
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1605(d) · $151.00 proposed penalty

  4. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5096291
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1606(c) · Significant and substantial (S&S) · $592.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F00BD1F
    Rum Creek Preparation Plant · 4605086

    130.0 on-site hours reported

  6. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5096290
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1606(c) · $151.00 proposed penalty

  7. Impoundment Spot Inspection

    inspectionRecord F02D1B0
    Rum Creek Preparation Plant · 4605086

    2.8 on-site hours reported

  8. Impoundment Spot Inspection

    inspectionRecord F02D1AB
    Rum Creek Preparation Plant · 4605086

    6.0 on-site hours reported

  9. Impoundment Spot Inspection

    inspectionRecord F02D199
    Rum Creek Preparation Plant · 4605086

    4.3 on-site hours reported

  10. Handtools (nonpowered)

    accidentRecord 220253230004
    Rum Creek Preparation Plant · 4605086

    No dys awy frm wrk,no rstr act

    Accident narrative

    employee was using pry bar and it slipped causing EE cut EE to cut EE's finger on a piece of metal

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9599161
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1606(c) · $151.00 proposed penalty

  12. Loading and haulage equipment; operation.

    violationRecord 9597930
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1607(p) · $151.00 proposed penalty

  13. Travelways at surface installations.

    violationRecord 9597929
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(a) · $151.00 proposed penalty

  14. Travelways at surface installations.

    violationRecord 9597928
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(b) · $245.00 proposed penalty

  15. Travelways at surface installations.

    violationRecord 9597927
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.205(a) · $151.00 proposed penalty

  16. Stepping or kneeling on object

    accidentRecord 220253170381
    Rum Creek Preparation Plant · 4605086

    Days away from work only

    Accident narrative

    on morning of 10/12/2025 at around 10:00am employee stepped out of truck, stepped on rock and said EE's knee popped. EE finished shift and went to the doctor the next day

  17. Regular Safety and Health Inspection

    inspectionRecord 7004348
    Rum Creek Preparation Plant · 4605086

    66.5 on-site hours reported

  18. Impoundment Spot Inspection

    inspectionRecord F0192A7
    Rum Creek Preparation Plant · 4605086

    2.5 on-site hours reported

  19. Electrical Technical Investigation

    inspectionRecord F00A0FC
    Rum Creek Preparation Plant · 4605086

    5.0 on-site hours reported

  20. Impoundment Spot Inspection

    inspectionRecord F01929D
    Rum Creek Preparation Plant · 4605086

    2.8 on-site hours reported

  21. Impoundment Spot Inspection

    inspectionRecord F019292
    Rum Creek Preparation Plant · 4605086

    5.0 on-site hours reported

  22. Accumulations of combustible materials.

    violationRecord 5091512
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1104 · $151.00 proposed penalty

  23. Loading and haulage equipment; installations.

    violationRecord 5091932
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1605(a) · $288.00 proposed penalty

  24. Loading and haulage equipment; installations.

    violationRecord 5091931
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1605(d) · $151.00 proposed penalty

  25. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5091511
    Rum Creek Preparation Plant · 4605086

    30 CFR 77.1606(c) · $549.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.