Atlantic Strategic Minerals safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Striking or bumping
Concord Mine & Concentrator · 4407222No dys awy frm wrk,no rstr act
Accident narrative
An employee was replacing a piece of equipment and brushed arm against a sharp piece of metal, causing a laceration to the right bicep.
Regular Safety and Health Inspection
Concord Mine & Concentrator · 440722226.3 on-site hours reported
Identification of power switches.
Concord Mine & Concentrator · 440722230 CFR 56.12018
Slip or fall of person
Concord Mine & Concentrator · 4407222Days away from work only
Accident narrative
Employee was walking down a slope to fuel a pump when they lost their footing and injured their knee. Employee notified employer of the incident, but did not request medical treatment until 10/15/2026 when injury did not improve on its own
Moving machine parts.
Mineral Separation Plant · 440722130 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Mineral Separation Plant · 44072217.0 on-site hours reported
Regular Safety and Health Inspection
Mineral Separation Plant · 44072219.0 on-site hours reported
Verbal Hazard Complaint Inspections
Concord Mine & Concentrator · 44072223.5 on-site hours reported
Construction and maintenance of guards.
Concord Mine & Concentrator · 440722230 CFR 56.14112(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Concord Mine & Concentrator · 440722218.0 on-site hours reported
Construction and maintenance of guards.
Concord Mine & Concentrator · 440722230 CFR 56.14112(b) · $151.00 proposed penalty
Handling of materials
Mineral Separation Plant · 4407221Days restricted activity only
Accident narrative
Injured was working with another employee to lift a 200lb roll from cart to material lift. When twisting at the waist, felt a pop in lower right back.
Spot Inspection
Mineral Separation Plant · 440722110.5 on-site hours reported
Spot Inspection
Concord Mine & Concentrator · 440722212.5 on-site hours reported
Testing grounding systems.
Mineral Separation Plant · 440722130 CFR 56.12028 · $151.00 proposed penalty
Regular Safety and Health Inspection
Mineral Separation Plant · 44072210.0 on-site hours reported
Testing grounding systems.
Concord Mine & Concentrator · 440722230 CFR 56.12028 · $151.00 proposed penalty
Construction and maintenance of guards.
Concord Mine & Concentrator · 440722230 CFR 56.14112(b) · $165.00 proposed penalty
Construction and maintenance of guards.
Concord Mine & Concentrator · 440722230 CFR 56.14112(b) · $151.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Concord Mine & Concentrator · 44072224.0 on-site hours reported
Regular Safety and Health Inspection
Concord Mine & Concentrator · 440722215.0 on-site hours reported
Machinery
Mineral Separation Plant · 4407221Days restricted activity only
Accident narrative
Employee was cutting a 3" diameter steel pipe. When pipe was cut free, the material supporting the pipe failed, causing the pipe to swing and struck the employee in the right shoulder.
103 (g) Written Notification Hazard Complaint Inspectio
Mineral Separation Plant · 44072214.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.