Asphalt Specialties Co., Inc. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Nelson Mining Resource · 05051323.8 on-site hours reported
Regular Safety and Health Inspection
Evans Sand and Gravel · 05052046.5 on-site hours reported
Access to stationary electrical equipment or switchgear.
Evans Sand and Gravel · 050520430 CFR 56.12019
Electric substations and liquid storage facilities.
Evans Sand and Gravel · 050520430 CFR 56.4130 · Significant and substantial (S&S)
Regular Safety and Health Inspection
Chavers Mining Resource · 05050430.0 on-site hours reported
Compliance Follow-up Inspection
Lone Tree Creek Quarry · 48018640.0 on-site hours reported
Changes; notification by operator.
Lone Tree Creek Quarry · 480186430 CFR 41.12 · $151.00 proposed penalty
Horns and backup alarms.
Lone Tree Creek Quarry · 480186430 CFR 56.14132(a) · $697.00 proposed penalty
Safety belts and lines.
Lone Tree Creek Quarry · 480186430 CFR 56.15005 · $2,312.00 proposed penalty
Electrical conductors.
Lone Tree Creek Quarry · 480186430 CFR 56.12004 · $209.00 proposed penalty
Machinery, equipment, and tools.
Lone Tree Creek Quarry · 480186430 CFR 56.14205 · $697.00 proposed penalty
Regular Safety and Health Inspection
Lone Tree Creek Quarry · 480186418.3 on-site hours reported
Handtools (nonpowered)
Lone Tree Creek Quarry · 4801864Days away from work only
Accident narrative
The miner was working on removing a bearing from a motor mount assembly. A small pry bar was being used to remove the bearing. The pry bar was under load when the miner struck the shaft with a hammer. The pry bar released and struck the miner in right cheek near the nose. The impact caused a laceration which required stitches and CT scans.
Records of training.
Nelson Mining Resource · 050513230 CFR 46.9(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Nelson Mining Resource · 050513230 CFR 50.30(a) · $151.00 proposed penalty
Records of training.
Nelson Mining Resource · 050513230 CFR 46.9(d) · $151.00 proposed penalty
Independent contractor register.
Nelson Mining Resource · 050513230 CFR 45.4(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Nelson Mining Resource · 050513215.5 on-site hours reported
Inspection.
Lone Tree Creek Quarry · 480186430 CFR 56.4201(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Lone Tree Creek Quarry · 480186430 CFR 56.14100(a) · $313.00 proposed penalty
Regular Safety and Health Inspection
Lone Tree Creek Quarry · 480186411.5 on-site hours reported
Electrical conductors.
Lone Tree Creek Quarry · 480186430 CFR 56.12004 · $151.00 proposed penalty
Safe access.
Lone Tree Creek Quarry · 480186430 CFR 56.11001 · Significant and substantial (S&S) · $151.00 proposed penalty
Safe access.
Lone Tree Creek Quarry · 480186430 CFR 56.11001 · $151.00 proposed penalty
Regular Safety and Health Inspection
Chavers Mining Resource · 05050434.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.