Ash Grove Cement South Texas LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Slip or fall of person
Hunter Cement Plant · 4102820Days restricted activity only
Accident narrative
Employee slipped and fell against a handrail bruising EE's right ribs
103 (g) Written Notification Hazard Complaint Inspectio
Hunter Cement Plant · 41028202.8 on-site hours reported
Machinery
Hunter Cement Plant · 4102820Days restricted activity only
Accident narrative
Employee was cutting a piece of handrail pipe in K2 RM bucket elevator pit and cut EE's left forearm, taken to clinic and received stitches.
Use of compressed air.
Hunter Cement Plant · 410282030 CFR 56.13020 · $151.00 proposed penalty
Inspection and cover plates.
Hunter Cement Plant · 410282030 CFR 56.12032 · $151.00 proposed penalty
Construction and maintenance of guards.
Hunter Cement Plant · 410282030 CFR 56.14112(b) · $209.00 proposed penalty
Housekeeping.
Hunter Cement Plant · 410282030 CFR 56.20003(a) · $151.00 proposed penalty
Electrical conductors.
Hunter Cement Plant · 410282030 CFR 56.12004 · $151.00 proposed penalty
Moving machine parts.
Hunter Cement Plant · 410282030 CFR 56.14107(a) · $151.00 proposed penalty
Examination of working places.
Hunter Cement Plant · 410282030 CFR 56.18002 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Hunter Cement Plant · 410282030 CFR 56.14109(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Inspection and cover plates.
Hunter Cement Plant · 410282030 CFR 56.12032 · $465.00 proposed penalty
Securing gas cylinders.
Hunter Cement Plant · 410282030 CFR 56.16005 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Hunter Cement Plant · 410282030 CFR 56.12008 · $151.00 proposed penalty
Handling of materials
Hunter Cement Plant · 4102820Days away from work only
Accident narrative
Employee was disengaging #2 FM spotter clutch and felt a pop in their right shoulder, diagnosed with a sprain to right shoulder
Examination of working places.
Hunter Cement Plant · 410282030 CFR 56.18002(b) · $151.00 proposed penalty
Moving machine parts.
Hunter Cement Plant · 410282030 CFR 56.14107(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Housekeeping.
Hunter Cement Plant · 410282030 CFR 56.20003(a) · $151.00 proposed penalty
Housekeeping.
Hunter Cement Plant · 410282030 CFR 56.20003(a) · $151.00 proposed penalty
Housekeeping.
Hunter Cement Plant · 410282030 CFR 56.20003(a) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Hunter Cement Plant · 410282030 CFR 56.12008 · $151.00 proposed penalty
Moving machine parts.
Hunter Cement Plant · 410282030 CFR 56.14107(a) · $151.00 proposed penalty
Electrical conductors.
Hunter Cement Plant · 410282030 CFR 56.12004 · $465.00 proposed penalty
Electrical conductors.
Hunter Cement Plant · 410282030 CFR 56.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
Hunter Cement Plant · 410282063.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.