Controls and switches.
CHANUTE QUARRY · 140003430 CFR 56.12002 · $3,448.00 proposed penalty
Testing grounding systems.
CHANUTE QUARRY · 140003430 CFR 56.12028 · $697.00 proposed penalty
Securing gas cylinders.
CHANUTE QUARRY · 140003430 CFR 56.16005 · $755.00 proposed penalty
Inspection and cover plates.
CHANUTE QUARRY · 140003430 CFR 56.12032 · $1,219.00 proposed penalty
Housekeeping.
CHANUTE QUARRY · 140003430 CFR 56.20003(c) · $504.00 proposed penalty
Compliance Follow-up Inspection
Foreman Quarry & Plant · 03002562.5 on-site hours reported
Regular Safety and Health Inspection
CHANUTE QUARRY · 1400034107.8 on-site hours reported
Inspection and cover plates.
Seattle Plant · 450035930 CFR 56.12032 · $1,550.00 proposed penalty
Verbal Hazard Complaint Inspections
Durkee Cement Plant · 35029703.0 on-site hours reported
Spot Inspection
Durkee Cement Plant · 35029701.0 on-site hours reported
Inspection and cover plates.
Seattle Plant · 450035930 CFR 56.12032 · $1,968.00 proposed penalty
Inspection and cover plates.
Seattle Plant · 450035930 CFR 56.12032 · $1,968.00 proposed penalty
Identification of power switches.
Seattle Plant · 450035930 CFR 56.12018 · $1,968.00 proposed penalty
Controls and switches.
Seattle Plant · 450035930 CFR 56.12002 · $592.00 proposed penalty
Construction and maintenance of ladders.
Seattle Plant · 450035930 CFR 56.11003 · $592.00 proposed penalty
Insulation and fittings for power wires and cables.
Seattle Plant · 450035930 CFR 56.12008 · $592.00 proposed penalty
Inspection and cover plates.
Seattle Plant · 450035930 CFR 56.12032 · $1,968.00 proposed penalty
Safety defects; examination, correction and records.
Seattle Plant · 450035930 CFR 56.14100(c) · $1,968.00 proposed penalty
Regular Safety and Health Inspection
Seattle Plant · 450035934.5 on-site hours reported
Stepping or kneeling on object
Foreman Quarry & Plant · 0300256Days away from work only
Accident narrative
Employee experienced an ankle sprain when they had stepped over a vacuum hose while performing their job duties.
Verbal Hazard Complaint Inspections
Ash Grove Cement Company · 41000263.0 on-site hours reported
Handling of materials
Foreman Quarry & Plant · 0300256Days away from work only
Accident narrative
While applying downward force on a valve an employee experienced pain in their right shoulder.
Inspection.
Leamington Cement Plant · 420166530 CFR 56.4201(a)(2) · $226.00 proposed penalty
Housekeeping.
Leamington Cement Plant · 420166530 CFR 56.20003(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Magazine requirements.
Leamington Cement Plant · 420166530 CFR 56.6132(a) · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.