ARKHOLA safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Records of training.
Conco Willard Quarries · 230003530 CFR 46.9(c)(2)(i) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Conco Willard Quarries · 230003530 CFR 56.14207 · $245.00 proposed penalty
Parking procedures for unattended equipment.
Conco Willard Quarries · 230003530 CFR 56.14207 · $151.00 proposed penalty
Inspection.
Conco Willard Quarries · 230003530 CFR 56.4201(a)(1) · $151.00 proposed penalty
Electrical conductors.
Conco Willard Quarries · 230003530 CFR 56.12004 · $151.00 proposed penalty
General requirements.
Conco Willard Quarries · 230003530 CFR 56.4200(b)(2) · $151.00 proposed penalty
Housekeeping.
Preston Quarry · 030146230 CFR 56.20003(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Preston Quarry · 030146211.3 on-site hours reported
Requirement for container labels.
Preston Quarry · 030146230 CFR 47.41(a)(1) · $151.00 proposed penalty
Powered haulage
East Quarry · 3400050Days restricted activity only
Accident narrative
moving a hose when struck in right knee by the bucket of a skid steer
Inspection.
Gravette Quarry · 030201230 CFR 56.4201(a)(2) · $151.00 proposed penalty
Stationary grinding machines.
Vinita Quarry · 340089330 CFR 56.14115(b) · $209.00 proposed penalty
Regular Safety and Health Inspection
Gravette Quarry · 030201210.0 on-site hours reported
Regular Safety and Health Inspection
Vinita Quarry · 340089321.8 on-site hours reported
Site-specific hazard awareness training.
Gravette Quarry · 030201230 CFR 46.11(a) · $151.00 proposed penalty
New miner training.
Gravette Quarry · 030201230 CFR 46.5(a) · Significant and substantial (S&S) · $336.00 proposed penalty
New miner training.
Gravette Quarry · 030201230 CFR 46.5(a) · Significant and substantial (S&S) · $320.00 proposed penalty
Regular Safety and Health Inspection
Arkhola Dredge & Plant · 030037916.5 on-site hours reported
Insulation and fittings for power wires and cables.
Arkhola Dredge & Plant · 030037930 CFR 56.12008 · $151.00 proposed penalty
Inspection.
Arkhola Dredge & Plant · 030037930 CFR 56.4201(a)(2) · $151.00 proposed penalty
Housekeeping.
Gore Quarry · 340171330 CFR 56.20003(a) · Significant and substantial (S&S) · $177.00 proposed penalty
Safety defects; examination, correction and records.
Gore Quarry · 340171330 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Gore Quarry · 340171322.0 on-site hours reported
Inspection.
Gore Quarry · 340171330 CFR 56.4201(a)(2) · $151.00 proposed penalty
Powered haulage
Gore Quarry · 3401713Days restricted activity only
Accident narrative
Employee was attempting to enter the Genie lift man basket when EE received an injury to EE's right third finger. Employee clipped EE's fall protection harness onto the basket and then gripped the basket railing and entered the basket. As employee's weight entered the basket, the basket slightly suspended, and EE's finger was pinned between the basket and platform railing.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.