Arkansas Lime Company safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Housekeeping.
LIMEDALE QUARRY · 030005030 CFR 56.20003(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Requirement for container labels.
LIMEDALE QUARRY · 030005030 CFR 47.41(a) · $245.00 proposed penalty
Brakes.
LIMEDALE QUARRY · 030005030 CFR 56.14101(a)(2) · $245.00 proposed penalty
Requirement for container labels.
LIMEDALE QUARRY · 030005030 CFR 47.41(a) · $245.00 proposed penalty
Danger signs.
LIMEDALE QUARRY · 030005030 CFR 56.12021 · $245.00 proposed penalty
Electrical conductors.
LIMEDALE QUARRY · 030005030 CFR 56.12004 · $245.00 proposed penalty
Regular Safety and Health Inspection
LIMEDALE QUARRY · 030005018.5 on-site hours reported
Housekeeping.
LIMEDALE QUARRY · 030005030 CFR 56.20003(a) · $245.00 proposed penalty
Safety defects; examination, correction and records.
LIMEDALE PLANT · 030046430 CFR 56.14100(b) · $151.00 proposed penalty
Grounding circuit enclosures.
LIMEDALE PLANT · 030046430 CFR 56.12025 · $151.00 proposed penalty
Regular Safety and Health Inspection
LIMEDALE PLANT · 030046413.8 on-site hours reported
Housekeeping.
LIMEDALE PLANT · 030046430 CFR 56.20003(a) · Significant and substantial (S&S) · $592.00 proposed penalty
Requirement for container labels.
LIMEDALE PLANT · 030046430 CFR 47.41(a) · $151.00 proposed penalty
Compliance Follow-up Inspection
LIMEDALE PLANT · 03004640.5 on-site hours reported
Verbal Hazard Complaint Inspections
LIMEDALE QUARRY · 03000502.5 on-site hours reported
Access to stationary electrical equipment or switchgear.
LIMEDALE PLANT · 030046430 CFR 56.12019 · $209.00 proposed penalty
Testing grounding systems.
LIMEDALE PLANT · 030046430 CFR 56.12028 · $697.00 proposed penalty
Safe access.
LIMEDALE PLANT · 030046430 CFR 56.11001 · $267.00 proposed penalty
Housekeeping.
LIMEDALE PLANT · 030046430 CFR 56.20003(c) · $267.00 proposed penalty
Air receiver tanks.
LIMEDALE PLANT · 030046430 CFR 56.13011 · $267.00 proposed penalty
Testing grounding systems.
LIMEDALE PLANT · 030046430 CFR 56.12028 · $883.00 proposed penalty
Safe access.
LIMEDALE PLANT · 030046430 CFR 56.11001 · $267.00 proposed penalty
Safety defects; examination, correction and records.
LIMEDALE PLANT · 030046430 CFR 56.14100(c) · $267.00 proposed penalty
Regular Safety and Health Inspection
LIMEDALE PLANT · 030046420.0 on-site hours reported
Spot Inspection
LIMEDALE PLANT · 03004641.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.