← Arcosa Specialty Mtls

Arcosa Specialty Mtls safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Requirement for container labels.

    violationRecord 5102454
    Arcosa ADAMS CLAIM #1850 · 2600668

    30 CFR 47.41(a)(1) · $151.00 proposed penalty

  2. Safety defects; examination, correction and records.

    violationRecord 5102453
    Arcosa ADAMS CLAIM #1850 · 2600668

    30 CFR 56.14100(b) · $267.00 proposed penalty

  3. Conveyor start-up warnings.

    violationRecord 5102452
    Arcosa ADAMS CLAIM #1850 · 2600668

    30 CFR 56.14201(b) · $151.00 proposed penalty

  4. Brakes.

    violationRecord 5102451
    Arcosa ADAMS CLAIM #1850 · 2600668

    30 CFR 56.14101(a)(3) · $151.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F042225
    Arcosa ADAMS CLAIM #1850 · 2600668

    7.0 on-site hours reported

  6. Regular Safety and Health Inspection

    inspectionRecord F043FCD
    Arcosa Specialty Materials HG2 · 3401364

    17.0 on-site hours reported

  7. Requirement for container labels.

    violationRecord 5175472
    Arcosa Specialty Materials HG2 · 3401364

    30 CFR 47.41(a) · $151.00 proposed penalty

  8. Parking procedures for unattended equipment.

    violationRecord 5175471
    Arcosa Specialty Materials HG2 · 3401364

    30 CFR 56.14207 · $151.00 proposed penalty

  9. Guarding electrical connections and resistor grids.

    violationRecord 5175470
    Arcosa Specialty Materials HG2 · 3401364

    30 CFR 56.12023 · $151.00 proposed penalty

  10. Insulation and fittings for power wires and cables.

    violationRecord 5175469
    Arcosa Specialty Materials HG2 · 3401364

    30 CFR 56.12008 · $177.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F024FEC
    Arcosa Specialty Materials Seattle #1890 · 4503239

    7.5 on-site hours reported

  12. General instructions for completing MSHA Form 7000-1.

    violationRecord 5105765
    Arcosa Specialty Materials Seattle #1890 · 4503239

    30 CFR 50.20-1 · $151.00 proposed penalty

  13. Moving machine parts.

    violationRecord 5105764
    Arcosa Specialty Materials Seattle #1890 · 4503239

    30 CFR 56.14107(a) · $151.00 proposed penalty

  14. Identification of power switches.

    violationRecord 5170324
    HG5 Plant 1883 · 3401964

    30 CFR 56.12018 · $177.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 5170323
    HG5 Plant 1883 · 3401964

    30 CFR 56.14100(b) · $177.00 proposed penalty

  16. General requirements.

    violationRecord 5170322
    HG5 Plant 1883 · 3401964

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F017E22
    HG5 Plant 1883 · 3401964

    11.3 on-site hours reported

  18. Safety defects; examination, correction and records.

    violationRecord 5175414
    Bouse Junction Plant #1882 · 3401828

    30 CFR 56.14100(b) · $151.00 proposed penalty

  19. Safety defects; examination, correction and records.

    violationRecord 5175413
    Bouse Junction Plant #1882 · 3401828

    30 CFR 56.14100(b) · $193.00 proposed penalty

  20. Gauges and regulators.

    violationRecord 5175412
    Bouse Junction Plant #1882 · 3401828

    30 CFR 56.4602 · $151.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F037500
    Bouse Junction Plant #1882 · 3401828

    15.8 on-site hours reported

  22. Parking procedures for unattended equipment.

    violationRecord 5175411
    Bouse Junction Plant #1882 · 3401828

    30 CFR 56.14207 · $151.00 proposed penalty

  23. Guarding electrical connections and resistor grids.

    violationRecord 5102374
    Arcosa ADAMS CLAIM #1850 · 2600668

    30 CFR 56.12023 · $151.00 proposed penalty

  24. Temporary, portable containers.

    violationRecord 5102373
    Arcosa ADAMS CLAIM #1850 · 2600668

    30 CFR 47.44(b) · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F02FDBD
    Arcosa ADAMS CLAIM #1850 · 2600668

    17.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.