High-pressure hose connections.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.13021 · $432.00 proposed penalty
Electrical conductors.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12004 · $1,679.00 proposed penalty
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · $9,757.00 proposed penalty
Testing grounding systems.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12028 · $432.00 proposed penalty
Testing grounding systems.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12028 · $432.00 proposed penalty
Protection of gas cylinder valves.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.16006 · $1,431.00 proposed penalty
Inspection and cover plates.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12032 · $432.00 proposed penalty
Insulation and fittings for power wires and cables.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12008 · $1,431.00 proposed penalty
Inspection and cover plates.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12032 · $432.00 proposed penalty
Regular Safety and Health Inspection
Arcosa Boulder Plant #1604 · 050441529.5 on-site hours reported
Inspection and cover plates.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12032 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Warning signs.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.4101 · $193.00 proposed penalty
Safety defects; examination, correction and records.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14100(b) · $7,084.00 proposed penalty
Safe access.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.11001 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Safety defects; examination, correction and records.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14100(b) · $1,431.00 proposed penalty
Construction and maintenance of guards.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14112(b) · $642.00 proposed penalty
Verbal Hazard Complaint Inspections
Arcosa Boulder Plant #1604 · 05044155.0 on-site hours reported
Inspection and cover plates.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12032 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Handrails and toeboards.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.11002 · $432.00 proposed penalty
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Other
Arcosa Boulder Plant #1604 · 0504415Dys awy frm wrk & restrctd act
Accident narrative
EE was working on a metal tube sleeve for protecting a sensor. Bending in awkward position felt tightness in lower back. Prescriptions prescribed.
Handling of materials
Arcosa Boulder Plant #1604 · 0504415Perm tot or perm prtl disablty
Accident narrative
Employee was making small adjustments to a v-belt drive system and pinched left index and middle finger between belt and sheave. Amputation of tip middle finger required.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.