Arcosa Boulder Plant #1604 · 050441530 CFR 46.9(c)(4) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14100(b) · $2,133.00 proposed penalty
Safety defects; examination, correction and records.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14100(b) · $1,431.00 proposed penalty
Air receiver tanks.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.13011 · $288.00 proposed penalty
Electric substations and liquid storage facilities.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.4130(b) · $642.00 proposed penalty
Air receiver tanks.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.13011 · $288.00 proposed penalty
Regular Safety and Health Inspection
Arcosa Boulder Plant #1604 · 050441547.8 on-site hours reported
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · $1,968.00 proposed penalty
Grounding circuit enclosures.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12025 · $642.00 proposed penalty
Moving machine parts.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14107(a) · $642.00 proposed penalty
Moving machine parts.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14107(a) · $642.00 proposed penalty
Correction of dangerous conditions.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12030 · $1,431.00 proposed penalty
Correction of dangerous conditions.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12030 · $1,431.00 proposed penalty
Correction of dangerous conditions.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12030 · $1,431.00 proposed penalty
Construction and maintenance of guards.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14112(a)(1) · $642.00 proposed penalty
Flying or falling materials.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14110 · $432.00 proposed penalty
Protection for openings around travelways.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.11012 · $1,431.00 proposed penalty
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Special Emphasis Programs
Arcosa Boulder Plant #1604 · 05044151.3 on-site hours reported
Training plans.
Arcosa Boulder Plant #1604 · 050441530 CFR 46.3(b)(4) · $151.00 proposed penalty
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.14100(c) · $432.00 proposed penalty
Identification of power switches.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.12018 · $1,431.00 proposed penalty
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · $1,968.00 proposed penalty
Housekeeping.
Arcosa Boulder Plant #1604 · 050441530 CFR 56.20003(a) · $1,968.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.