Aracoma Coal Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Lynn Branch No. 2 Mine · 460957530 CFR 75.370(a)(1) · $3,448.00 proposed penalty
Mine ventilation plan; submission and approval.
Lynn Branch No. 2 Mine · 460957530 CFR 75.370(a)(1) · $336.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
Lynn Branch No. 2 Mine · 460957530 CFR 75.902 · $151.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
Lynn Branch No. 2 Mine · 460957530 CFR 75.701 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Davy Branch Mine · 460957430 CFR 75.512 · $432.00 proposed penalty
Accumulation of combustible materials.
Davy Branch Mine · 460957430 CFR 75.400 · $549.00 proposed penalty
Roof control plan.
Davy Branch Mine · 460957430 CFR 75.220(a)(1) · $398.00 proposed penalty
Regular Safety and Health Inspection
Davy Branch Mine · 4609574193.5 on-site hours reported
Regular Safety and Health Inspection
Lynn Branch No. 2 Mine · 4609575389.5 on-site hours reported
Spot Inspections
Lynn Branch No. 2 Mine · 4609575103(i) · 9.0 on-site hours reported
Spot Inspections
Lynn Branch No. 2 Mine · 4609575103(i) · 8.0 on-site hours reported
Preshift examination at fixed intervals.
Lynn Branch No. 2 Mine · 460957530 CFR 75.360(f) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Cedar Grove Mine No 3 · 460961130 CFR 75.512 · $151.00 proposed penalty
Spot Inspection
Cedar Grove Mine No 3 · 460961117.5 on-site hours reported
Automatic fire sensor and warning device systems; installation; minimum requirements.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1103-4(b) · $288.00 proposed penalty
Accumulation of combustible materials.
Lynn Branch No. 2 Mine · 460957530 CFR 75.400 · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Cedar Grove Mine No 3 · 460961130 CFR 75.512 · $245.00 proposed penalty
Roof control plan.
Cedar Grove Mine No 3 · 460961130 CFR 75.220(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.512 · $245.00 proposed penalty
Accumulation of combustible materials.
Lynn Branch No. 2 Mine · 460957530 CFR 75.400 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Lynn Branch No. 2 Mine · 460957530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Accumulation of combustible materials.
Lynn Branch No. 2 Mine · 460957530 CFR 75.400 · $226.00 proposed penalty
Accumulation of combustible materials.
Lynn Branch No. 2 Mine · 460957530 CFR 75.400 · $504.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1107-4(c) · $151.00 proposed penalty
Accumulation of combustible materials.
Davy Branch Mine · 460957430 CFR 75.400 · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.