Amrize Cement Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safety defects; examination, correction and records.
AMRIZE RAVENA PLANT · 300000630 CFR 56.14100(c) · $151.00 proposed penalty
Inspection.
AMRIZE RAVENA PLANT · 300000630 CFR 56.4201(a)(2) · $151.00 proposed penalty
Dust control.
AMRIZE RAVENA PLANT · 300000630 CFR 56.9315 · $177.00 proposed penalty
Electrical conductors.
Amrize Paulding Plant · 330006930 CFR 56.12004 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Amrize Paulding Plant · 330006930 CFR 56.12008 · $151.00 proposed penalty
Examination of working places.
Amrize Paulding Plant · 330006930 CFR 56.18002(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Regular Safety and Health Inspection
Amrize Ste Genevieve Plant · 2300284127.0 on-site hours reported
Regular Safety and Health Inspection
AMRIZE RAVENA PLANT · 3000006128.8 on-site hours reported
Compliance Follow-up Inspection
Amrize Ada Plant · 34000231.5 on-site hours reported
Inspection and cover plates.
Amrize Ste Genevieve Plant · 230028430 CFR 56.12032 · $432.00 proposed penalty
Housekeeping.
Amrize Ste Genevieve Plant · 230028430 CFR 56.20003(a) · $432.00 proposed penalty
High-pressure hose connections.
Amrize Ste Genevieve Plant · 230028430 CFR 56.13021 · $151.00 proposed penalty
Handrails and toeboards.
Amrize Ste Genevieve Plant · 230028430 CFR 56.11002 · $151.00 proposed penalty
Moving machine parts.
Amrize Paulding Plant · 330006930 CFR 56.14107(a) · $209.00 proposed penalty
Spot Inspection
AMRIZE RAVENA PLANT · 30000060.0 on-site hours reported
General instructions for completing MSHA Form 7000-1.
AMRIZE RAVENA PLANT · 300000630 CFR 50.20-1 · $151.00 proposed penalty
Housekeeping.
Amrize Paulding Plant · 330006930 CFR 56.20003(a) · $151.00 proposed penalty
Housekeeping.
Amrize Paulding Plant · 330006930 CFR 56.20003(a) · $151.00 proposed penalty
Housekeeping.
Amrize Paulding Plant · 330006930 CFR 56.20003(a) · $151.00 proposed penalty
Moving machine parts.
Amrize Paulding Plant · 330006930 CFR 56.14107(a) · $465.00 proposed penalty
Access to stationary electrical equipment or switchgear.
Amrize Paulding Plant · 330006930 CFR 56.12019 · $151.00 proposed penalty
Handling of materials
Amrize Whitehall Plant · 3600271No dys awy frm wrk,no rstr act
Accident narrative
A TDF attendant was unstacking tires. The EE pulled a tire off the stack, causing dust to hit EE's face, and enter EE's left eye causing irritation. The EE wore safety glasses, first aid was administered EE reported discomfort on 5/7 and EE went to and urgent care facility. No foreign body was discovered, EE was given no restrictions. The doctor prescribed antibiotic.
Securing movable parts.
Amrize Alpena Plant · 200004430 CFR 56.14206(b) · $209.00 proposed penalty
Brakes.
Amrize Alpena Plant · 200004430 CFR 56.14101(a)(2) · $209.00 proposed penalty
Safety defects; examination, correction and records.
Amrize Alpena Plant · 200004430 CFR 56.14100(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.