  1. Electric equipment; examination, testing and maintenance.

    violationRecord 9733677
    GENTRY MINE #3 · 4202263

    30 CFR 75.512 · Significant and substantial (S&S) · $2,133.00 proposed penalty

  2. Maintenance of diesel-powered equipment.

    violationRecord 9733676
    GENTRY MINE #3 · 4202263

    30 CFR 75.1914(f)(2) · $151.00 proposed penalty

  3. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9733675
    GENTRY MINE #3 · 4202263

    30 CFR 75.1107-9(a) · $151.00 proposed penalty

  4. Disorders (physical agents)

    accidentRecord 220250290016
    GENTRY MINE #3 · 4202263

    Occupatnal illness not deg 1-6

    Accident narrative

    Employee was shoveling belts on the surface in the cold weather. 2 fingers on their right hand started hurting. it was possibly a slight condition of frost bite.

  5. Maintenance of incombustible content of rock dust.

    violationRecord 9735263
    GENTRY MINE #3 · 4202263

    30 CFR 75.403 · $151.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 9735262
    GENTRY MINE #3 · 4202263

    30 CFR 75.512 · $267.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9735261
    GENTRY MINE #3 · 4202263

    30 CFR 75.1731(a) · $755.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 9735260
    GENTRY MINE #3 · 4202263

    30 CFR 75.517 · $151.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 9735259
    GENTRY MINE #3 · 4202263

    30 CFR 75.517 · $151.00 proposed penalty

  10. Identification of circuit breakers.

    violationRecord 9735258
    GENTRY MINE #3 · 4202263

    30 CFR 75.904 · $193.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 9735257
    GENTRY MINE #3 · 4202263

    30 CFR 75.517 · $151.00 proposed penalty

  12. Identification of circuit breakers.

    violationRecord 9735256
    GENTRY MINE #3 · 4202263

    30 CFR 75.904 · $193.00 proposed penalty

  13. Verbal Hazard Complaint Inspections

    inspectionRecord F020353
    GENTRY MINE #3 · 4202263

    7.0 on-site hours reported

  14. Roof control plan.

    violationRecord 9735255
    GENTRY MINE #3 · 4202263

    30 CFR 75.220(a)(1) · $177.00 proposed penalty

  15. Roof control plan.

    violationRecord 9735254
    GENTRY MINE #3 · 4202263

    30 CFR 75.220(a)(1) · $177.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9735252
    GENTRY MINE #3 · 4202263

    30 CFR 75.400 · $151.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F020352
    GENTRY MINE #3 · 4202263

    417.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.