ACTIVE / OPERATOR PORTFOLIO

Alcoa Fuels Inc.

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0181714

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Liberty Mine1202428 · Active5/8 quarters reportedWarrick, INSurface · MSHA: Coal (Bituminous)270,82585,072300139.3

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

30

1 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q12
  6. 2026 Q216
  7. 2026 Q312
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

4,530.00

30 of 30 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1302
  6. 2026 Q22,416
  7. 2026 Q31,812
  8. 2026 Q4 *—

On-site inspection hours

139.25

10 inspections · 10 with hours

  1. 2025 Q1—
  2. 2025 Q23.00
  3. 2025 Q3—
  4. 2025 Q438.25
  5. 2026 Q1—
  6. 2026 Q282.00
  7. 2026 Q316.00
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—0023.0
2025-Q300—000—
2025-Q400—00138.3
2026-Q120302.00000—
2026-Q21612,416.0000482.0
2026-Q31201,812.0000316.0
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF016BAC
    Liberty Mine · 1202428

    Spot Inspection · 1.5 on-site hours

  2. inspectionF016BA9
    Liberty Mine · 1202428

    Spot Inspection · 11.5 on-site hours

  3. inspectionF013320
    Liberty Mine · 1202428

    Impoundment Spot Inspection · 3.0 on-site hours

  4. violation5222164
    Liberty Mine · 1202428

    77.208(e) · $151.00 proposed

  5. violation5222163
    Liberty Mine · 1202428

    77.1605(d) · $151.00 proposed

  6. violation5222162
    Liberty Mine · 1202428

    77.1110 · $151.00 proposed

  7. violation5222161
    Liberty Mine · 1202428

    77.502 · $151.00 proposed

  8. violation5222160
    Liberty Mine · 1202428

    77.400(a) · $151.00 proposed

  9. violation5222159
    Liberty Mine · 1202428

    77.404(a) · $151.00 proposed

  10. violation5222158
    Liberty Mine · 1202428

    77.502 · $151.00 proposed

  11. violation5222157
    Liberty Mine · 1202428

    77.502 · $151.00 proposed

  12. violation5222156
    Liberty Mine · 1202428

    77.1103(a) · $151.00 proposed

  13. violation5222155
    Liberty Mine · 1202428

    77.400(a) · $151.00 proposed

  14. violation5222154
    Liberty Mine · 1202428

    77.502 · $151.00 proposed

  15. violation5222153
    Liberty Mine · 1202428

    77.1103(a) · $151.00 proposed

  16. violation5222152
    Liberty Mine · 1202428

    77.404(a) · $151.00 proposed

  17. violation5222151
    Liberty Mine · 1202428

    77.404(a) · $151.00 proposed

  18. violation5222101
    Liberty Mine · 1202428

    77.404(a) · $151.00 proposed

  19. violation5222100
    Liberty Mine · 1202428

    77.505 · $151.00 proposed

  20. violation5222099
    Liberty Mine · 1202428

    77.404(a) · $151.00 proposed

  21. violation5222098
    Liberty Mine · 1202428

    77.502 · $151.00 proposed

  22. violation5222097
    Liberty Mine · 1202428

    77.404(a) · S&S · $151.00 proposed

  23. violation5222096
    Liberty Mine · 1202428

    77.904 · $151.00 proposed

  24. violation5222095
    Liberty Mine · 1202428

    77.400(a) · $151.00 proposed

  25. inspectionF0427BC
    Liberty Mine · 1202428

    Regular Safety and Health Inspection · 67.5 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS423,3356 rows · 1 receiving plants
HEAT CONTENT · BTU/LB10,994Weighted by reported tons
SULFUR / ASH · % BY WEIGHT3.84 / 10.36Separate averages over measured receipts
DELIVERED COST · USD/TON—0.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2026-Q1136,35011,0833.8210.24—
2026-Q2227,27110,9523.8910.42—
2026-Q3 *59,71410,9503.7110.40—
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 12249 · preliminaryLIBERTY MINE1202428Warrick6705 · IN · LIBERTY MINE59,714—Not published10,9503.7110.40ContractBITRail
2026-06EIA row 10336 · preliminaryLIBERTY MINE1202428Warrick6705 · IN · LIBERTY MINE49,010—Not published10,9053.8010.50ContractBITRail
2026-05EIA row 8469 · preliminaryLIBERTY MINE1202428Warrick6705 · IN · LIBERTY MINE72,547—Not published10,9053.9410.40ContractBITRail
2026-04EIA row 6682 · preliminaryLIBERTY MINE1202428Warrick6705 · IN · LIBERTY MINE105,714—Not published11,0053.8910.40ContractBITRail
2026-03EIA row 4852 · preliminaryLIBERTY MINE1202428Warrick6705 · IN · LIBERTY MINE94,855—Not published11,0853.8610.00ContractBITRail
2026-02EIA row 2924 · preliminaryLIBERTY MINE1202428Warrick6705 · IN · LIBERTY MINE41,495—Not published11,0803.7310.80ContractBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON52.34Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS515,675Allocated from published county sales
ESTIMATED COAL REVENUE · USD26,990,415Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Liberty Mine1202428 · Warrick, Indiana485,14452.34515,67526,990,415County allocation estimate18.29% of eligible county production4 eligible mines / 4 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.