← 101 Coal Inc.

101 Coal Inc. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; installations.

    violationRecord 5085808
    Smith #2 · 1519945

    30 CFR 77.1605(d) · Significant and substantial (S&S) · $151.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5085807
    Smith #2 · 1519945

    30 CFR 77.1606(c) · $151.00 proposed penalty

  3. Loading and haulage equipment; operation.

    violationRecord 5085806
    Smith #2 · 1519945

    30 CFR 77.1607(i) · $151.00 proposed penalty

  4. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5080424
    Smith #2 · 1519945

    30 CFR 77.1606(c) · Significant and substantial (S&S) · $177.00 proposed penalty

  5. Loading and haulage equipment; operation.

    violationRecord 5080423
    Smith #2 · 1519945

    30 CFR 77.1607(i)

  6. Loading and haulage equipment; operation.

    violationRecord 5080422
    Smith #2 · 1519945

    30 CFR 77.1607(i) · Significant and substantial (S&S) · $1,252.00 proposed penalty

  7. Machinery and equipment; operation and maintenance.

    violationRecord 5080421
    Smith #2 · 1519945

    30 CFR 77.404(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  8. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5080420
    Smith #2 · 1519945

    30 CFR 77.1606(c) · $151.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5085805
    Smith #2 · 1519945

    30 CFR 75.202(a) · Significant and substantial (S&S) · $504.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5085804
    Smith #2 · 1519945

    30 CFR 75.512 · $151.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F003CDB
    Coalgood Darby 1 · 1519939

    36.5 on-site hours reported

  12. First-aid equipment; location; minimum requirements.

    violationRecord 9772578
    Magnum #2 · 1519869

    30 CFR 75.1713-7(b)(10) · $151.00 proposed penalty

  13. On-shift examination.

    violationRecord 9772577
    Magnum #2 · 1519869

    30 CFR 75.362(g)(3) · $151.00 proposed penalty

  14. Highwalls, pits and spoil banks; plans.

    violationRecord 5080410
    Right Fork Splint · 1518423

    30 CFR 77.1000 · $151.00 proposed penalty

  15. Protection of trailing cables.

    violationRecord 5080409
    Right Fork Splint · 1518423

    30 CFR 77.604 · $151.00 proposed penalty

  16. Loading and haulage equipment; operation.

    violationRecord 5085800
    Smith #2 · 1519945

    30 CFR 77.1607(i) · $151.00 proposed penalty

  17. Highwalls, pits and spoil banks; plans.

    violationRecord 9778935
    Right Fork Splint · 1518423

    30 CFR 77.1000 · $151.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778934
    Right Fork Splint · 1518423

    30 CFR 77.1606(c) · $151.00 proposed penalty

  19. Escapeways; bituminous and lignite mines.

    violationRecord 9772576
    Magnum #2 · 1519869

    30 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty

  20. Regular Safety and Health Inspection

    inspectionRecord F0016A7
    Right Fork Splint · 1518423

    41.0 on-site hours reported

  21. Regular Safety and Health Inspection

    inspectionRecord 7021419
    Magnum #2 · 1519869

    133.3 on-site hours reported

  22. Regular Safety and Health Inspection

    inspectionRecord F000E0A
    Smith #2 · 1519945

    150.3 on-site hours reported

  23. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 9779236
    Coalgood Darby 1 · 1519939

    30 CFR 75.1712-3(c)(1)(i) · $151.00 proposed penalty

  24. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 9779235
    Coalgood Darby 1 · 1519939

    30 CFR 75.1712-3(a) · $151.00 proposed penalty

  25. Verbal Hazard Complaint Inspections

    inspectionRecord F000E09
    Coalgood Darby 1 · 1519939

    5.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.